background image

Step 28

Parts needed -          &          &

Fix the Fascias (

No.25 & 26)

 to the 

front and back of the building 

using 3x40mm screws per Fascia. 

 

Fix the Finials  (

No.27

) centrally 

over the Fascias using 2x40mm 

screws per finial.

Ensure to trap the felt between the 

Fascia and the building.

16x40mm Screws

40mm 

screw

25

26

25

27

26

1!

2!

Pre drill 

hole

50kg

 

27

25

26

27

Step 29

Parts needed -          & 

Fix the Black Handle (

No. 29

) to the Door 

using 4x30mm black screws.

Fix the Door Stop (

No. 28

) to the inside of

the  Door Panel at the top and bottom

using 3x20mm screws as shown per door stop.

 

4x 30mm black screws.

6x20mm screws.

20mm 

screw

30mm 

screw

29

28

29

28

1!

2!

Pre drill 

hole

50kg

 

28

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Playhouse Maintenance:

It is recommended that the following checks and maintenance are carried out at the beginning 

of each season as well as at regular intervals during the usage season.

- Check all nuts /bolts/ screws for tightness and tighten when required.

- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.

- Check hinges.

- Replace defective parts in accordance with the manufacturers instructions. 

- Check any crossbeams, suspensions and anchors.

- If a swing is included; check the swing seat, chains and ropes.

IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD

P19

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

Содержание 02DTSHOA08066WBF-V1-PEFC

Страница 1: ...list provided When you are ready to start make sure you have the right tools at hand not supplied including a Phillips screw driver Flathead screwdriver Stanley knife Wood saw Step ladder Hammer Spiri...

Страница 2: ...product code combinations used to create each playhouse 8x6 Garage 8x6 Playhouse SI 002 001 0082 Model Product Codes 02DTSHOA08066WBF V1 PEFC Playhouse 02DTWP2WPP V1 PEFC Window Pack 8x7 Playhouse Wit...

Страница 3: ...l QTY 1 AI 02SR1309X628 V1 Window QTY 2 AI FW496X462 V1 Double Window QTY 2 AI DFW995X460 V1 Building Components 02DTSHOA08066WBF V1 PEFC Plain Gable Top QTY 1 AI S11SHOAGT2360X802 V1 Window Gable Top...

Страница 4: ...95x1040mm QTY 2 SR1295 G 1040mm 23 Black Handle QTY 2 37 38 PI 07 0033 Hinge QTY 4 PI 07 0113 41 42 Window Box QTY 2 AI 02WB661X92 V1 Window Shutters QTY 2 AI 02WS190X520 V1 43 45 Window Crosses QTY 8...

Страница 5: ...B 27x44x2029mm QTY 1 F2744 G 2049mm angled Support Rail C 27x44x1686mm QTY 1 F2744 G 1706mm angled 53 52 51 02DTSHOA08066WBF V1 PEFC 02DTWP2WPP V1 PEFC 02DTOAVP0801 V1 PEFC 50mm Screw x 8 40mm Screw x...

Страница 6: ...5 14 10 4 14 13 13 10 12mm 12mm 30 2 9 A 30mm screw Step 2 Parts needed 0 Lay the Door Panel No 2 with the boards facing up on a flat surface Place the door No 9 within the door aperture Position two...

Страница 7: ...on the floor as shown in the illustration Fix together by screwing through the framing of the Window Panel No 5 into the framing of the Plain Panel No 3 using 3x50mm screws Do not secure the building...

Страница 8: ...2 Fix by screwing through the Window Panel s framing into the Door Panel No 2 using 6x50mm screws Do not secure the building to the Floor until the Roof is fitted 6x50mm screws 50mm screw 2 2 1 2 Pre...

Страница 9: ...and the Window Gable Top No 10 on top of the Door Panel No 2 ensuring to interlock the bottom board of the gable with the top board of the panel as shown in the diagram Secure the Gables No 10 11 to...

Страница 10: ...n the illustration Fix the Roof bearer No 20 into position with two Corner Brackets No 31 using 4x30mm per bracket as shown Fix into position screws per bracket 8x30mm screws 20 30mm screw 31 1 2 Pre...

Страница 11: ...gable framing and is flush to the back of the building Make sure the 21mm overhang on the roof is at the apex of the building Secure by screwing through the roof panel No 7 into the gable below using...

Страница 12: ...kg 7 8 8 Step 19 Parts needed Once both Roof Panel 2 s No 8 are fixed to the building locate a U channel No 33 around the central framing where the two roofs meet Secure in place using 20mm screws Do...

Страница 13: ...o be cut to fit the angle as shown in the diagram 21x30mm screws 22 23 1 2 Pre drill hole 30mm screw Cut down trims to fit 24 22 22 22 24 23 24 23 23 22 23 If you have purchased a Garage Playhouse ple...

Страница 14: ...35 Step 24a Parts needed Position the second Garage Door No 36 to the left hand side of the door opening Using the Door Spacer Strips No 35 create the 12mm gap between the panel and the door top botto...

Страница 15: ...s per handle 8x30mm black screws 1 2 Pre drill hole 50kg 37 30mm screw 37 37 To finish constructing the playhouse please skip to step 27 on page 18 P15 Please retain product label and instructions for...

Страница 16: ...rts needed Fix the Window Blocks No 46 to the Double Window No 43 as shown with 1x30mm screw Place the Double window No 43 into the newly created window hole between the window panel No 44 and Door Pa...

Страница 17: ...cladding into the Box using 4x20mm screws per box Do not fit the window box underneath the double window if have purchased the playhouse with veranda Locate 2 Window Shutters No 42 around the top wind...

Страница 18: ...m and leave a 50mm overhang on each side Secure with felt tacks at 100mm intervals Please note The cottage playhouse has been usedforillustrativepurposes thisstepisrequired for each playhouse 120x Fel...

Страница 19: ...diately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks...

Страница 20: ...wn trims to fit Step 28c Parts needed 40 Locate the Cover Trims No 47 Centrally over where the Window Panel No 44 and Door Panel No 2 join Using a pencil and a straight edge mark the excess onto the s...

Страница 21: ...x40mm screws 2x60mm screws 50 40mm screw 1 2 Pre drill hole 52 50 52 50 60mm screw Step 31c Parts needed Position the Support Rail A No 51 on top of the Veranda Floor No 48 and flush to the Safety Rai...

Страница 22: ...ny points are rounded 50mm screw 41 Felt tacks Step 33c Parts needed Cut the felt No 34 into four strips of 2310mm L X 1000mm W and place on the building in the order shown in the illustration Ensure...

Страница 23: ...ediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following check...

Страница 24: ...2 1 3 4...

Страница 25: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: