Step 18
Parts needed -
Place another Roof Panel 2
(No.8)
onto
the front of the building, ensuring the
roof rests into the gaps of the gable
framing. The roof should overhang the
front of the building by 300mm.
Make sure the 21mm overhang on the
roof is at the apex of the building.
Secure by screwing through the roof
panels
(No.8)
into the gable below
using 8x50mm screws.
Do not secure the building to the
Floor until the Roof is fitted.
8x50mm screws
8
50mm
screw
1!
2!
Pre drill
hole
50kg
7
8
8
Step 19
Parts needed -
Once both Roof Panel 2’s
(No.8)
are
fixed to the building, locate a U-channel
(No.33)
around the central framing
where the two roofs meet.
Secure in place using 20mm screws.
Do not secure the building to the
Floor until the Roof is fitted.
6x20mm screws
33
1!
2!
Pre drill
hole
20mm
screw
33
8
8
Step 20
Once the roof is fitted and the building
is square, secure the building to the
Floor, using 50mm screws in alignment
with the floor joists.
22x50mm Screws
50mm
screw
1!
2!
Pre drill
hole
b
b
b
b
b
b
b
b
b
b
b
b
b
P12
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
Содержание 02DTSHOA08066WBF-V1-PEFC
Страница 24: ...2 1 3 4...
Страница 25: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...