background image

P 8

Please retain product label and instructions for future reference

             

Felt 

tacks 

23

23

23

Step 15

Parts needed - No. 23 QTY 1

Cut the felt 

(No. 23)

 into three sheets at 

3050mm.  Lay onto roof as shown in 

diagram ensuring there is a 50mm 

overhang around the sides.

Apply the felt tacks with a 100mm space 

per tack..

122x Tacks

HANDLE

WITH CARE

1

2

3

4

23

23

23

Step 16

Parts needed - No. 12 QTY 8

                                 No. 13 QTY 2 

Fit the Cover Trims 

(No. 12)

 over 

each panel join and corner of the building 

as shown in the illustration using 30mm 

screws.  Pre drill to avoid splitting.  

Position the shorter Cover Trims 

(No. 13)

over the gable top panel joins above the 

longer Cover Trims 

(No. 12)

  and fix in

place using 2x30mm screws per trim.

34x30mm Screws

12

12

12

12

12

13

30mm 

screw

Pre drill 

hole

12

Step 17

Parts needed - No. 10 QTY 4

                                 No. 18 QTY 2

Fit the Fascias 

(No. 10)

 to the roof over 

the felt and secure in place with 40mm 

screws as shown.  Pre drill to avoid 

splitting.

Followed by adding the Finials 

(No. 18)

 

over the Fascias using 2x 40mm screws 

per Finial.    

 

16x40mm Screws

40mm 

screw

Pre drill 

hole

10

10

18

18

10

10

Содержание 01DTSHRAX1008SDNW-V1

Страница 1: ...l be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should...

Страница 2: ...x1 FS2828 150mm Cover Trims 12x40x1792mm x10 S1240 1792mm Cover Trims 12x40x450mm x2 S1240 450mm Floor Blocks 28x28x400mm x8 F2828 400mm Ridge Bar 27x70x1431mm x2 F2770 1431mm Ridge Bar Support 27x70...

Страница 3: ...QTY 1 No 19 QTY 3 Place the door No 4 within the Door Panel No 1 Fix the T Hinges No 19 onto the door and Door Panel as shown taking into account on which side of the Door Panel opening you want the...

Страница 4: ...assembly from Step 2 using 8x30mm screws per floor Repeat this to create two assembled floors 16x30mm Screws Pre drill hole 30mm screw 7 7 Step 4 Parts needed No 7 QTY 2 Place the assembled floor pane...

Страница 5: ...Position the panels so there is equal spacing between the floor and cladding on all sides 6x50mm Screws 50mm screw Pre drill hole 3 3 2 Step 7 Parts needed No 2 or 1 or 3 QTY 1 No 3 or 1 or 2 QTY 2 Fi...

Страница 6: ...with 6x50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the panels so there is equal spacing between the floor and cladding on all sides...

Страница 7: ...gh the roof panels No 8 and into the ridge bar No 14 below using 6x60mm screws per Roof Panel It is essential that the ridge bar No 14 and roof panel No 8 framing pull together when fixed with 60mm sc...

Страница 8: ...join and corner of the building as shown in the illustration using 30mm screws Pre drill to avoid splitting Position the shorter Cover Trims No 13 over the gable top panel joins above the longer Cove...

Страница 9: ...blocks using 30mm screws 2x30mm Screws Step 18 Parts needed No 9 QTY 1 No 11 QTY 2 30mm screw 30mm screw Pre drill hole Pre drill hole 11 11 a b a b 9 Step 19 Parts needed No 21 QTY 1 Screw the Pad Bo...

Страница 10: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Страница 11: ...2 1 3 4...

Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: