Please retain product label and instructions for future reference

             

Nail Bag

There may be extra screws present in the nail bag 

50mm Screw x 104

20mm Screw x 30

40mm Screw x 36

60mm Screw x 12

Felt Tacks x 122

Remove transportation 

blocks from the bottom of 

each panel before beginning 

assembly. Each Panel should 

have two blocks.

Pre Assembly 

Step 1

Parts needed - No. 1  QTY 1

                                 No. 4  QTY 1

                                 No. 19 QTY 3

Place the door 

(No. 4)

 within the 

Door Panel 

(No. 1)

.  Fix the T Hinges

(No. 19)

 onto the door

 

and Door 

Panel as shown 

(taking into account

on which side of the Door Panel

opening you want the Door to open)

.  

Ensure that the screws go through the 

cladding and into the framing behind.

21x30mm Screws

19

Pre drill 

hole

30mm 

screw

1

4

**PLEASE NOTE**

  Before fitting the 

hinges, ensure the door is in the correct

position depending on which side you

want the door to open.  See external 

illustrations below which show the doors

internal framing. 

Opens from the Left

Opens from the Right

Содержание 01DTSHRAX1008SDNW-V1

Страница 1: ...l be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should...

Страница 2: ...x1 FS2828 150mm Cover Trims 12x40x1792mm x10 S1240 1792mm Cover Trims 12x40x450mm x2 S1240 450mm Floor Blocks 28x28x400mm x8 F2828 400mm Ridge Bar 27x70x1431mm x2 F2770 1431mm Ridge Bar Support 27x70...

Страница 3: ...QTY 1 No 19 QTY 3 Place the door No 4 within the Door Panel No 1 Fix the T Hinges No 19 onto the door and Door Panel as shown taking into account on which side of the Door Panel opening you want the...

Страница 4: ...assembly from Step 2 using 8x30mm screws per floor Repeat this to create two assembled floors 16x30mm Screws Pre drill hole 30mm screw 7 7 Step 4 Parts needed No 7 QTY 2 Place the assembled floor pane...

Страница 5: ...Position the panels so there is equal spacing between the floor and cladding on all sides 6x50mm Screws 50mm screw Pre drill hole 3 3 2 Step 7 Parts needed No 2 or 1 or 3 QTY 1 No 3 or 1 or 2 QTY 2 Fi...

Страница 6: ...with 6x50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the panels so there is equal spacing between the floor and cladding on all sides...

Страница 7: ...gh the roof panels No 8 and into the ridge bar No 14 below using 6x60mm screws per Roof Panel It is essential that the ridge bar No 14 and roof panel No 8 framing pull together when fixed with 60mm sc...

Страница 8: ...join and corner of the building as shown in the illustration using 30mm screws Pre drill to avoid splitting Position the shorter Cover Trims No 13 over the gable top panel joins above the longer Cove...

Страница 9: ...blocks using 30mm screws 2x30mm Screws Step 18 Parts needed No 9 QTY 1 No 11 QTY 2 30mm screw 30mm screw Pre drill hole Pre drill hole 11 11 a b a b 9 Step 19 Parts needed No 21 QTY 1 Screw the Pad Bo...

Страница 10: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Страница 11: ...2 1 3 4...

Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: