![Mercia Garden Products 01DTSHRAX1008SDNW-V1 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/mercia-garden-products/01dtshrax1008sdnw-v1/01dtshrax1008sdnw-v1_general-instructions-manual_1772664007.webp)
P 7
Please retain product label and instructions for future reference
Step 12
Parts needed - No. 8 QTY 4
No. 22 QTY 2
Place the Roof Panels
(No. 8)
on top of the
building making sure the framing in the roof
panels sits firmly within the Gable Tops
(No. 5 &
6)
and on top of the Ridge Bar
(No. 14)
.
**Make sure that you have got the roof panels
the correct way round with the recess at the
top of the apex as shown in the diagram.**
**The edges of the roof panels must be flush
with the outer cladding of the Gable Tops
(No. 5 & 6).**
Secure the roof panels
(No. 8)
together using the
metal U channel
(No. 22)
and 10x20mm screws per
U channel as shown in diagram.
From the top, fix directly through the roof panels
(No. 8)
and into the ridge bar
(No. 14)
below
using 6x60mm screws per Roof Panel.
It is essential that the ridge bar
(No. 14)
and roof
panel
(No. 8)
framing pull together when fixed
with 60mm screws. You may require another
person pushing the ridge bar
(No. 14)
up
from below to achieve this.
**HINT - Follow the nailing line of the
framing on the roof panel so that you
are more likely to fix into the ridge bar
below. **
20x20mm Screws
12x60mm Screws
60mm
screw
Pre drill
hole
8
8
22
20mm
screw
8
8
Pre drill
hole
40mm
screw
Step 13
Use 40mm screws to fix the roofs
(No. 8)
down
the sides and at the bottom being sure that
the screws attach into the framing below.
20x40mm Screws
Step 14
Once the roof is fixed, attach the building
to the floor with 50mm screws.
Ensure the screws go through the panel into
the floor framing
28x50mm Screws
50mm
screw
Pre drill
hole
b
Содержание 01DTSHRAX1008SDNW-V1
Страница 11: ...2 1 3 4...
Страница 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...