INSTALLATION INSTRUCTIONS
6
Rev 2.0
Mercator Pty Ltd. All Rights Reserved.
Make sure electricity is turned off at the main power box before commencing work. Turn off the
power by removing fuse or turning off circuit breaker before installing the product and replacing
lamp.
Make sure that ceiling joists are strong enough and of adequate size to support the weight of at
least 35 kg.
1.
Take some time choosing an appropriate mounting
location and direction with reference to instructions in
previous page. Make sure all clearances required around
the product are observed and there is no obstructing
structure nearby the outlet. The area behind the
intended location must be clear of obstacles such as
cables, utility pipes and joists.
INSTALLING GRILLE ON WALL
2.
Mark out a circle of the base diameter at desired
location. Using an appropriate cutting device, cut along
the line and remove excess material from the marked
location.
3.
Remove louver from the base of grille noting there are
four screw holes on the base. Push a duct through the
hole and connect it to the collar of the base. Secure the
ducting connection with the clamp provided. Then fix
the base at the desired spot using four suitable screws
(not provided). Install louver onto the base. Install
ductwork following recommendation on ducting
installation in previous page, and direct the duct towards
general direction of cut out and air outlet on the product.
INSTALLING BATHROOM HEATER
4.
Use a pencil and trace around the template supplied the
package.