Installation Manual
M-WRG-M/MB-FR75/1 / FR75/2 / FR63/1 / FR63/2
- 12 -
V E N T I L AT I O N & H E AT R E C O V E R Y
VENTILATION THE RIGHT WAY
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
7.4
Chasing out channels for connecting cables
►
Chase one channel for the mains cable
(item 1 in Fig. 10) and one for the control
cable, if required (item 3 in Fig. 10).
NOTE
—
A separate channel is needed for the con-
trol cable.
—
The wall channels in Fig. 10 are shown by
way of example. Alternative cable ducts
are shown as dashed lines (items 2 and 4
in Fig. 10). For the subsequent electrical
installation work, we recommend running
the mains cable from the left and the con-
trol cable (if used) from the right at the wall
breakthrough.
7.5
Running the connecting cables
DANGER
Potentially fatal voltages.
—
The electrical installation work must only be
carried out by a qualified electrician.
—
The VDE regulations or any special safety
regulations applicable in your country apply
to the electrical installation work.
NOTE
You will find details of the types of mains cable
and control cable suitable for each ventilation unit
in Tab. 1 on page 13
►
Run the mains cable (item 1 in Fig. 11) and
the control cable, if required (item 2 in Fig.
11). The cables should extend roughly 250
mm beyond the wall.
►
Fix the mains cable and the control cable (if
required) in position.
Fig. 10: Chasing out channels for connecting
cables
Fig. 11: Running the connecting cables,
dimensions in millimetres