Installation Manual
M-WRG-M/MB-FR75/1 / FR75/2 / FR63/1 / FR63/2
- 17 -
V E N T I L AT I O N & H E AT R E C O V E R Y
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
►
Apply the plaster scrim M-WRG-PG (item 4 in Fig. 20 on page 16) to the wall box and the
solid wall.
►
Cover the flexible pipes with plaster scrim.
NOTE
Applying plaster scrim will prevent cracks subsequently forming in the plaster.
►
Plaster the solid wall.
7.14
Aligning the wall box on the outside
►
Fill the gaps between the wall box and wall
breakthrough all around and continuously
with expanding foam or using another insu-
lating material.
—
If the solid wall is
less than
36.5 cm thick:
► Use a Styrofoam saw to cut off the
excess wall box (item 1 in Fig. 21 and
Fig. 22) and filler piece, if necessary
(item 2 in Fig. 22), so that they are
flush with the solid wall or any insula-
tion.
—
If the solid wall is
more than
36.5 cm thick:
► Compensate for thicker walls with
continuous pipes. For walls that are
60 cm thick or more, you will need 100
cm long supply and exhaust air pipes
(M-WRG-LR 100, part no. 5580).
NOTE
The pipes must be continuous. Pipes that have
been joined must not be used as there is a risk of
allowing condensation to penetrate the masonry.
Fig. 21: Aligning the wall box
with-
out
filler piece
Fig. 22: Aligning the wall box
with
filler piece