InfiniBand Switch Platform Hardware User Manual
Mellanox Technologies
16
Inside the single box is 3 smaller boxes.
•
1 installation kit box
•
1 box containing 4 power cords 250v 15a 2.0M, C14 to C13, USA UL Standard
•
1 cable management kit
Before you install your new IS5200 series chassis, unpack the system and check to make
sure that all the parts have been sent, check this against the parts list. Check the parts for
visible damage that may have occurred during shipping.
1.4
Leaf Package Contents
The leafs are ordered by the customer and are shipped 4 to a box. The customer will
receive as many boxes as needed to fill the order.
1.5
Management Package Contents
When a second management module is ordered the package includes:
•
1 management module ordered by the customer
•
1 RJ45 to DB9 harness
1.6
Physical Installation
The switch platform uses 10U of rack space in a standard 19” rack, 9U for the chassis
and 1U for the shelf. The switch ships from the factory with mounting holes on the spine
side. There are upper brackets to connect the leaf side to the rack near the top of the chas-
sis. The weight of the switch is supported from underneath the unit by the shelf.
If anything is damaged or missing, contact your customer representative immediately.
The rack mounting holes conform to the EIA-310 standard for 19-inch racks. Guaran-
tee proper ventilation, by leaving 8cm (3”) of space to the front and rear of the switch.
This will ensure proper air flow through the chassis. This is crucial for maintaining
good airflow at ambient temperature. In particular, route cables such that they do not
impede the air into or out of the chassis.
Warning:
This equipment is very heavy. Safety is the first concern. Make sure that
adequate manpower and proper equipment is used for transporting and moving the
chassis.
The fully loaded chassis weighs:
120 kg (265 LBS) full configuration
48 KG (105 LBS) empty configuration
83.94kg (185 LBS) shipped configuration
Содержание MIS5100Q-3DNC
Страница 2: ...Document Number 3268 Mellanox Technologies 2...
Страница 85: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 85 5 6 7 8 9 10 11 45 C 113 F 8 3 PSU...
Страница 103: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 103 4 5 6 7 8 9 10 45 C 113 F 8 3...
Страница 104: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 104 11 12 InfiniBand 13 14 15 16 17 InfiniBand...