Figure 42.
Figure 42: Intact vs Defected Power Pin Holders
5. Start with the ejector handles fully open; that is, at 45 degrees to the front panel of the
management.
6. Holding the management by its sides, carefully set the management board into the
chassis.
7. Using only the management ejector handles, slowly slide the board into the chassis
until the hooks reach the vertical bar.
8. Catch the hooks onto the vertical bar of the chassis and push the ejector handle shut.
9. Lock the ejector handles onto the board.
1.9.6
Switch Shut-Down Procedures
To shut down the chassis run the following command twice (once for each MM):
Do not apply excessive force to slide in the management board. If you feel resistance,
remove the management and double check both the chassis and management for any
damage.
On switch systems with dual management systems, first connect the cable and configure
the master management module CPU and only then configure the slave. By default the
master CPU is the top management module. For further information on the master and
slave roles, see the
FabricIT EFM
Software UM section “High Availability”.
All management modules in the chassis must go through an initial configuration proce-
dure. See the Installation Guide for the initial configuration procedure.
Reload halt [noconfirm]
Pass
Fail
Содержание MIS5100Q-3DNC
Страница 2: ...Document Number 3268 Mellanox Technologies 2...
Страница 85: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 85 5 6 7 8 9 10 11 45 C 113 F 8 3 PSU...
Страница 103: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 103 4 5 6 7 8 9 10 45 C 113 F 8 3...
Страница 104: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 104 11 12 InfiniBand 13 14 15 16 17 InfiniBand...