Installation
Rev 1.1
Mellanox Technologies
30
2.7
Cable Installation
All cables can be inserted or removed with the unit powered on.
To insert a cable:
press the connector into the port receptacle until the connector is firmly seated. The LED indica-
tor, corresponding to each data port, will light when the physical connection is established. When
a logical connection is made the relevant port LED will turn on.
To remove a cable:
disengage the locks and slowly pull the connector away from the port receptacle. The LED indi-
cator for that port will turn off when the cable is unseated.
For more information about port LEDs refer to Section 3.3.1.6, “Port LEDs,” on page 56.
For further information and guidance, it is recommended to read more about Mellanox breakout
cables on the
.
Figure 20: Breakout or Fanout Cable
Do not force the cable into the cage with more than 40 newtons / 9.0 pounds / 4kg
force. Greater insertion force may cause damage to the cable or the cage.
Содержание MetroX TX6240
Страница 1: ...www mellanox com Mellanox MetroX Long Haul Systems Hardware User Manual Models TX6240 TX6280 Rev 1 1...
Страница 8: ...Mellanox Technologies 8 Table 37 RJ 45 CONSOLE Pinout 72 Table 38 RJ 45 I2C Pinout 72...
Страница 79: ...Rev 1 1 Mellanox Technologies 79 5 6 7 8 9 10...
Страница 80: ...Mellanox Technologies 80 11 12 13 14 15 16...
Страница 81: ...Rev 1 1 Mellanox Technologies 81 17 18 19 20 21 WEEE 22...
Страница 83: ...Rev 1 1 Mellanox Technologies 83 7 8 9 10 InfiniBand 11 12 13 PSU InfiniBand...
Страница 96: ...Mellanox Technologies 96 4 5 6 7 8 9 10 InfiniBand 45 C 113 F 8 3 InfiniBand...
Страница 97: ...Rev 1 1 Mellanox Technologies 97 11 12 13 14 15 16 UL CSA UL CSA 3 16 AWG 1 5 6 4 5 125 13 HAR 3 1 0 300 250 10...