background image

BX 4000 Sereies Quick Start Guide

Mellanox Technologies 

Rev 1

.5

    4      

6. Copper InfiniBand Cable Connecting/Disconnecting

  

7.  Rack Mounting and Servicing

8. Equipment Installation

9. Equipment Disposal

10. Local and National Electrical Codes

11. Hazardous Radiation Exposure  

12. UL Approved AC Power Cords     

Mechanical Installation

The gateway platform can be rack mounted for installation in a standard 19” rack. Power side and connector 
side are arbitrary, the rack kit can be mounted so that one side is even with the vertical rack support and the 
other side is recessed into the rack. For convenience we will use the terms power side of the gateway to 

Copper InfiniBand cables are heavy and not flexible, as such they should be 
carefully attached to or detached from the connectors. Refer to the cable manu-
facturer for special warnings and instructions.

When this product is mounted or serviced in a rack, special precautions must be 
taken to ensure that the system remains stable. In general you should fill the 
rack with equipment starting from the bottom to the top.

This equipment should be installed, replaced, or serviced only by trained and 
qualified personnel.

Disposal of this equipment should be in accordance to all national laws and reg-
ulations.

This equipment should be installed in compliance with local and national elec-
trical codes.

Caution – Use of controls or adjustment or performance of procedures other 
than those specified herein may result in hazardous radiation exposure.

CLASS 1 LASER PRODUCT and reference to the most recent laser standards:

 

IEC 60 825-1:1993 + A1:1997 + A2:2001 and EN 60825-1:1994+A1:1996+ 
A2:2001

For North American power connection, select a power supply cord that is UL 
Listed and CSA Certified 3 - conductor, [18 AWG], terminated in a molded on 
plug cap rated at 125 V, [15 A], with a minimum length of 1.5m [six feet] but no 
longer than 4.5m.

For European connection, select a power supply cord that is internationally har-
monized and marked "<HAR>", 3 - conductor, minimum 0,75 mm2 wire, rated 
at 300 V, with a PVC insulated jacket. The cord must have a molded on plug cap 
rated 250 V, 10 A.

Содержание BX4000 Series

Страница 1: ...orresponding downlink ports Each gateway port group is assigned a color to easily associate the uplink ports to the corresponding downlink ports of the gateway port group Figure 1 MTB 4010 Gateway Por...

Страница 2: ...k ports per gateway port group These ports have SFP connectors that support both direct attach copper cable and optical cables by using a SR or LR modules The downlink ports are labelled alpha numeric...

Страница 3: ...carrying on with installation procedures Installation Safety Warnings For Safety Warnings in French and German and for special regulations regarding Finland Sweden Den mark and Norway see the gateway...

Страница 4: ...system remains stable In general you should fill the rack with equipment starting from the bottom to the top This equipment should be installed replaced or serviced only by trained and qualified perso...

Страница 5: ...de All connectivity is via the connector side panel All connectors can support active cables Figure 3 MTB4010B Gateway System Power Side and Connector Side Panels Package Contents The package should i...

Страница 6: ...en sent check this against the parts list Check the parts for visible damages that may have occurred during shipping Note If anything is damaged or missing contact your customer representative immedia...

Страница 7: ...ck and the door can be as little as 4 cm on one side of the rack and as much as 18 cm on the other side of the rack Keep in mind that there can be as many as 10 cables for the MTB4010B onnected to the...

Страница 8: ...he rails Figure 6 Clipping in the Caged Nuts 4 Using two of the pan head screws and one washer for each rail install the rails to the end of the rack Place the rail behind the holes in the rack and sc...

Страница 9: ...irmly seated The GREEN LED indicator above of each CX4 ports or above or below each SFP port will light when the physical connection is established that is when the unit is powered on and a cable is p...

Страница 10: ...ions Access through Serial Port 1 Connect the host PC to the RS 232 port of the MTB4000 series gateway using the supplied cable 2 Make sure to connect to the RS 232 RJ 45 port of the switch and not to...

Страница 11: ...PU Ethernet port to your local 1Gigabit Ethernet network 2 Connect any Linux station to the Ethernet 3 At the prompt enter ssh admin 172 22 2 2 4 Enter the password Password admin Access through Telne...

Страница 12: ...when you run a sudo command The sudo command will ask for your password each time you run it If you logout from the current session or if it closes by timing out 10 min you will be asked for your pas...

Страница 13: ...n it will implement the current configuration and ask you if you want to change the IP address configuration Do you want to configure IP Address Y n Default Yes N will redirect you to the main menu Y...

Страница 14: ...es After completing these selections the selected configuration will be displayed and you will be asked if you want to save it Selected configuration DEVICE eth0 BOOTPROTO static IPADDR IP_ADDRESS NET...

Страница 15: ...or full use of FabricIT The standard management module without a license allows for managing the gateway using the Web interface or the com mand line interface and software supplied on the management...

Отзывы: