Cashflow
©
2612 Engineers Handbook
©
MEI 2009
Page 13 G1
INSTALLATION
Unpacking the Note Acceptor
Unpack the note acceptor and immediately inspect it for damage. If the unit is damaged, return it to its
original carton along with packing materials.
Notify the delivering carrier of damages and request immediate inspection. Send a letter of
intent to file a claim to the delivering carrier within 72 hours from the time of delivery. Send a
copy of the letter to the shipper.
Only the consignee (the person or company receiving the note acceptor) can file a claim against the
carrier for concealed damages.
Retain the original carton and packing materials for future use in shipping or transporting the
note acceptor.
Mounting the Note Acceptor
The Cashflow
©
2612 has been designed for ease of mounting onto existing studs provided
by Original Equipment Manufacturers (OEMs). Some machines may require brackets or
faceplates to mount the unit. Refer to your machine operation manual or contact your
distributor/OEM for more model-specific mounting information.
The Cashflow
©
2612 has a tie-wrap included with each unit to secure its interface harness to
the mounting area of the machine. Use the tie-wrap for every installation.
1.
Disconnect all power to the machine.
2.
Connect the interface harnesses from the
machine to the unit.
3.
Wrap the tie-wrap around the interface harness.
5.
Secure the unit to the mounting studs with the appropriate hardware.
(OEM Machine with fixing studs)
Содержание CASHFLOW 2612
Страница 1: ...MEI CASHFLOW 2612 NOTE VALIDATOR ENGINEERS HANDBOOK...
Страница 6: ...Cashflow 2612 Engineers Handbook MEI 2009 Page 6 G1 Model Number Explanation Example...
Страница 15: ...Cashflow 2612 Engineers Handbook MEI 2009 Page 15 G1 Dimensions...
Страница 37: ...Cashflow 2612 Engineers Handbook MEI 2009 Page 37 G1 YOUR REPRESENTATIVE...