28
✓
Minimum clearance from the sides and back of the unit to combustible constructions is 36 in.
(91cm) from the sides and 36 in. (91cm) from the back.
✓
All internal packaging removed.
✓
Knobs turn freely.
✓
Burners are tight and sitting properly on orifices.
✓
Pressure regulator connected and set. Gas connections to braai using hose & regulator
assembly provided for 9kg LP gas cylinder.
✓
Unit tested and free of leaks.
✓
User informed of gas supply shut off valve location.
✓
Removed all packaging, including straps, before using the braai.
INSTALLATION FINAL CHECKLIST
We feel much better knowing
you’re
safer for
having taken the time to go through that first
section thoroughly.
Now,
let’s
get on with putting your Megamaster
braai together so you can unleash your inner
kebab/ pesto mushrooms / gourmet boerie roll
rock star!
WHEW ,
Содержание 720-0804C
Страница 8: ...8 NOW THAT WE GOT ALL THE SAFETY INFORMATION OUT OF THE WAY LET S START WITH SOME ELBOW GREASE ...
Страница 9: ...9 PACKAGE PARTS LIST 5 6 7 8 9 10 1 3 4 2 x2 x2 x2 ...
Страница 10: ...10 14 16 17 18 19 20 11 12 13 15 x2 x2 x2 PACKAGE PARTS LIST x2 ...
Страница 11: ...11 23 24 22 25 x3 x2 21 PACKAGE PARTS LIST ...
Страница 13: ...1 2 3 4 5 4 13 1 A x4 2 A x4 ASSEMBLY INSTRUCTIONS ...
Страница 14: ...2 7 6 3 8 14 3 4 A x8 ...
Страница 15: ...B x4 9 10 11 E x2 D x2 15 5 6 ...
Страница 16: ...16 7 8 A x4 12 13 ...
Страница 17: ...17 9 10 A x4 A x4 ...
Страница 18: ...18 11 12 B x4 15 14 16 14 ...
Страница 19: ...19 13 14 C A x3 x3 B x2 Bx2 ...
Страница 20: ...20 15 16 B x4 16 17 18 ...
Страница 21: ...21 17 18 C A x3 x3 B x2 17 Bx2 ...
Страница 22: ...22 19 20 19 20 Bx2 Ex2 B x2 E x2 19 ...
Страница 23: ...23 21 22 21 22 ...
Страница 24: ...24 23 24 23 24 ...
Страница 25: ...25 25 26 25 ...