5
Installation
The Model 976EX Bar should be located in the most convenient position so that the
pins of the Bar are directed towards the target area. The bar should be positioned to
give an unrestricted path for the ions to travel to the target area. It should typically be
between 300mm and 600mm away from the target area.
The bar must be mounted using the brackets provided. The bracket should be
positioned on a maximum 500mm pitch. The M6 bolts must be used to secure the
976EX bar to the machine frame.
The Meech Model 976EX must be connected to the Meech Model 977v3 ( UL Listed)
which must be located outside of any EX zoned area.
The Model 976EX connects to the 977v3 by plugging the male plugs, found at the
end of the Bar cabling, directly into the high voltage sockets of the controller. The
plugs and sockets are marked with “+” positive and “-” negative indicators for correct
connection to the power supply.
Содержание 976EX
Страница 1: ...Model 976EX Operating Manual Long Range DC Bar...
Страница 2: ......
Страница 4: ......
Страница 14: ...10 Disconnect all bars from the controller 11 Reconnect the supply and switch on the unit 12...
Страница 18: ......
Страница 19: ......