Page 82
65-J Desel - Servce & Parts Manual
February 2021
Secton 18 - Mechancal Components
Swing Bearing/Turntable Components
THIS PROCESS REQUIRES SPECIFIC REPAIR SKILLS AND
EXPERIENCE, APPROPRIATE LIFTING EQUIPMENT AND A PROPER
WORKPLACE������ DEATH, SERIOUS INJURY OR SIGNIFICANT MACHINE
DAMAGE COULD OCCUR IF YOU ATTEMPT THIS PROCESS WITHOUT
THE APPROPRIATE SKILLS AND EQUIPMENT������
The Swing Bearing is located between the turntable and the machine chassis. It’s purpose is to
provide continuous turntable rotation.
Note:
The module doors and module contents are omitted from some of the following illustrations to
better show the disassembly process. It is not necessary to remove the doors or contents to
perform this procedure unless stated.
Disassembly
Park the machine on a firm level surface.
Throughout this procedure, thoroughly clean all
hydraulic connections and tag all hoses for proper
reassembly before disconnecting them. Immediately
plug and cap all openings to prevent contamination.
Tag electrical connections before disconnecting
them.
Remove the Platform/Jib assembly as described in
steps 1 through 11 of the Platform Level Cylinder
removal procedure on page 71.
Disassemble the boom linkage as described in the
Boom Lift Cylinders/Boom Linkage procedure on
page 75.
Thread two M24 lifting eyebolts into the machine
counterweight and rig slings as shown. Apply slight
lifting pressure.
Remove the four bolts that secure the counterweight
to the machine turntable.
Remove the counterweight.
Note:
Counterweight Mass:
4005 LBS
1817 KG
1.
2.
3.
4.
5.
6.
7.
ART_4942
M24 Lifting Eye
Minimum
30 mm length
Содержание 65-J Diesel
Страница 1: ...Part 95105 February 2021 Serial Number Range 14800000 Up Service Parts Manual 65 J Diesel ART_4883 ...
Страница 223: ...Page 217 65 J Diesel Service Parts Manual February 2021 Notes ...
Страница 224: ...Page 218 65 J Diesel Service Parts Manual February 2021 Notes ...
Страница 225: ...Page 219 65 J Diesel Service Parts Manual February 2021 Notes ...