Page 26
65-J Desel - Servce & Parts Manual
February 2021
Secton 10 - Hydraulc System
Install fittings, plugs, springs, balls, and orifices. Use one drop of Loctite 242 or equivalent thread
locker on each screw-in orifice.
Install valves.
Installation
Attach manifold assembly to mounting plate with mounting bolts.
Connect solenoid leads as previously tagged.
Connect hydraulic hoses as previously tagged. Be certain to tighten hoses.
Open the ball valves on the Hydraulic Tank.
Failure to open the ball valves on the Hydraulic Tank will result in
damage to the pumps������
Connect the battery.
Operate each hydraulic function and check for leaks and for proper operation.
Adjust valve pressures.
Hydraulic Pressure Adjustment
Before attempting to check and/or adjust pressure relief valves, operate the machine for 15 minutes
or long enough to sufficiently warm the hydraulic fluid to normal operating temperature.
Insert a 0-5000 psi gauge onto the pressure test port GP using gauge adapter fitting MEC part no.
50974
65-J Diesel Pressure Settings
System
Setting
Adjustment
Gauge Port
Main Functions Manifold Relief
3000 psi
207 bar
@ Primary Functions Pump
GP
Crossport Steering Relief
1500 psi
103 bar
@ Primary Functions Pump
Extend Relief
1500 psi
103 bar
RV1
1.
2.
1.
2.
3.
4.
5.
6.
7.
Содержание 65-J Diesel
Страница 1: ...Part 95105 February 2021 Serial Number Range 14800000 Up Service Parts Manual 65 J Diesel ART_4883 ...
Страница 223: ...Page 217 65 J Diesel Service Parts Manual February 2021 Notes ...
Страница 224: ...Page 218 65 J Diesel Service Parts Manual February 2021 Notes ...
Страница 225: ...Page 219 65 J Diesel Service Parts Manual February 2021 Notes ...