Page 26
84RT Seres Speed Level™ - Operator’s Manual
July 2021
Secton 9 - Fold Down Platform Ralngs
2684 Models
1
Open & Secure The Material
Loading Gate
Lift the upper Control Box off
the Deck Extension Rail and
place out of the way.
Lift the gate latch and swing
the Material Loading Gate
open.
Secure the gate to the side
guardrail with the gate latch.
•
•
•
ART_3483
Corner Cap
2 places
2
Lift & Lower The Deck Extension
Rails
Lift and lower the right-side
deck extension rail.
Lift and lower the left-side deck
extension rail.
•
•
3
Lift & Lower The End Side Rails
Lift and lower the left-side end
rail.
Lift and lower the right-side
end rail.
•
•
4
Lift & Lower The Entry Rails
Remove the corner caps that
connect the rear side rails to
the entry rails.
Lift and lower the gate-side
entry rail.
Lift and lower the left-side
entry rail.
•
•
•
5
Lift & Lower The Rear Side Rails
Lift and lower the left rear side
rail.
Lift and lower the right rear
side rail.
•
•
6
Guard rail fold-down is complete.
To return the machine to normal operation mode:
Lift all rails into their upright position, then push down to secure them in their sockets
Install all corner caps and secure all gates
Position the platform control box on the right side rail at the front of the deck extension.
DO NOT
use the machine until all gates and guard rails are in position and properly secured.
•
•
•