1-10
Indoor Unit
SB150BR/200BR/250BR/300BR/350BR/400BR/500BR
Outdoor Unit
Voltage range**
380V-415V / 1Ph / 50Hz
Power Supply Cable*
Number of Conductors
a) Indoor Unit
5
b) Outdoor Unit
5
Interconnection cable*
8
Number of conductors
SB150BR/200BR/250BR/300BR/350BR/400BR/500BR
Indoor Unit
4WV2
4WV1
OF2
OF1
N2
N1
COMP2
COMP1
4WV
OF
N
L
COMP
HP4 HP4
HP3 HP3
HP2 HP2
HP1 HP1
DS4 DS4
DS3 DS3
DS2 DS2
DS1 DS1
DS DS
HP HP
R
N
T
S
R
N
T
S
The electrical power must be
provided with protection device
(circuit breaker or fuse) with pole
separation system and minimum
contact gap of 3mm.
!
Outdoor Unit
Indoor Unit
IMPORTANT:
*
The figures shown in the table are for information purpose only. They should be checked and selected
to comply with the local/national codes of regulations. This is also subject to the type of
installation and conductors used.
** The appropriate voltage range should be checked with label data on the unit. ETL listed is only applicable
to 60Hz power supply only.
Power Supply
VACUUMING AND CHARGING
Vacuuming is necessary to eliminate all moisture and air from the system. The series II Outdoor Unit is provided with
flare valve fittings.
Vacuuming
Before vacuuming, perform leak check for refrigeration
circuit. After the system piping are properly connected,
connect the flexible hoses to the correct charging nipples as
shown in the diagram. Ensure that flexible hose from charging
nipples are connected to the vacuum pump via standard
servicing valves and pressure gauges (gauge manifold).
Vacuum the air conditioner system to at least 500 microns
Hg. Do not start the unit when the system is engaged in
vacuuming.
Charging
Before charging, the vacuum must be held at 500 microns Hg
for at least 15 minutes, then break vacuum by charging R-22
refrigerant. Operate the unit for 15 minutes and ensure the
refrigerant charges is of correct by monitoring running current,
gas and liquid line pressures. Suction and discharge pipe
pressure should be in the region of 75 psig and 275 psig
generally.
After ensuring the system is correctly charged, remove flexible
hose from charging nipples and replace caps.
Gas Pipe
Liquid Pipe
Gas Pipe
Liquid Pipe
Vacuum Pump
Power Supply
Содержание SB00B
Страница 2: ......
Страница 3: ...i OUTLINE AND DIMENSIONS SB40B 50B 40BR 50BR SB60B 75B 100B 60BR 75BR 100BR ...
Страница 8: ...vi SL30C 40C 50C 60C 30CR 40CR 50CR MSS 75B 100B 125B 100BR NOTE FOR VERTICAL AIR DISCHARGE ...
Страница 9: ...vii MSS100C MSS60C 75C 60CR 75CR MSS 150C 125BR ...
Страница 95: ...MEMO ...
Страница 96: ...MEMO ...
Страница 97: ......
Страница 100: ......
Страница 106: ...vi SL30C 40C 50C 60C 30CR 40CR 50CR MSS 75B 100B 125B 100BR WEŠö W œuLŽ uBÐ uN m dH ...
Страница 107: ...vii MSS100C MSS60C 75C 60CR 75CR ...
Страница 123: ......