38
McQuay IM 487-4
Introduction
Step 3
1
Assemble side panels A and B to uprights using #10 drill
screws supplied. Make certain side panels are flush against
uprights before securing into place.
2
Fasten bottom panel D to base channel using #10 drill
screws and to side panels A and B using #10 screws
supplied.
3
Set top panel C in place and fasten to side panels A and B
using #10 screws and to top panel using #10 screws
supplied.
Figure 43. Step 3 illustration
Step 4
1
Reassemble access door to vestibule by screwing hinges
into side panel using screws saved from Step 1. (Access
door must be attached to the vestibule in the same opening
direction as it was on the unit.)
2
Remove and discard latch handle locking screws and
retaining washer. Fasten door latch assembly to side panel
using screws and bushings saved from Step 1. (Latch must
be fastened on the same side as when located on the unit.)
3
Fasten upright angles to vestibule using #10 screws
supplied.
4
Seal between unit and vestibule with silicone sealant along
top and sides as shown.
Note:
Any holes cut in the floor of the unit must be sealed to
prevent water leakage.
Figure 44. Step 4 illustration
#10 Screw
#10 Drill
Screw
#10 Screw
Upright Angle
#10 Screw
Gasketing
Silicone
Sealant
Door Latch Assembly
(See Note)
Door
Prop
Door
Silicone
Sealant
Gasketing
Upright
Angle
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Содержание RoofPak RAH 047C
Страница 118: ...McQuay IM 487 4 115 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 119: ...116 McQuay IM 487 4 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 120: ...McQuay IM 487 4 117 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...