Operating methods & features 

Ventilation

 - Ventilation is created by a combination of inlets/ outlets allowing clean air to be drawn into the 

building and dirty air to be exhausted. 

A 50mm wide baffled side vent runs the length of the building (on both sides), sited between the top of the 

polyboard and the base of the roof sheet. A hinged ridge vent in the roof is operated by a cranked handle 

and can be opened and closed to increase/ decrease ventilation (shown below). Both personnel doors have 

a moveable ventilation panel fitted, this panel can be moved up and down to increase/ decrease ventilation.

Precautions in use 

Fabric roof sheet - 

The fabric roof sheet is robust and resilient. However, it can be punctured if struck with 

heavy or sharp objects. Ensure to take care when moving the building or lifting materials within or around the 

structure.

Framework - 

The steel framework is made from structural grade material designed to support the structure 

and canopy during ‘normal’ operations detailed in this manual. If the steel structure becomes damaged in 

any way this can compromise the structural integrity. Care should be taken when towing the structure and 

when vehicles and machinery are operating in close proximity to the building. 

Skids -

 Skids should be checked before and after every towing procedure. Ensure the bottom surface has 

not been excessively worn or damaged. Inspect for fractures and bending in high-stress areas, especially 

where the tow bar is attached to the skids and skids are joined.  

 

Cleaning - 

A standard cleaning procedure is to jet-wash the entire interior of the building thoroughly after 

each moving cycle to eliminate chicken waste and additional grime that may have manifested. All surfaces 

can be cleaned with water and a suitable detergent, no adsorbent materials are used in the construction of 

the building so water can be used liberally without causing damage. Bird waste can build up on the skids, 

this should be broken off or washed away wherever possible.

 

 

Hinged popholes and personnel doors -

 Check regularly that the closures fasten securely and hinges 

pivot correctly with the full range of movement expected. Keep handles clean and operational for frequent 

use.

Moving the building -

 Before attempting to move the building it is prudent to check the weather forecast 

for strong wind speeds. During the moving procedure the building will not be anchored to the ground, the 

building should not be moved in winds greater than 20mph.

CRANKED HANDLE 

(POSITION 1)

ROTATE CRANKED HANDLE FROM 

HERE WHILE HOLDING AT POSITION 1 

TO OPEN/ CLOSE THE VENT

CRANKED HANDLE HOOKS ON TO THE 

RING AT THE BASE OF THE THREAD

Содержание Agile 4250

Страница 1: ...be inspected and signed off by a responsible member of staff Once the installation is signed off it is the customers responsibility to ensure the product is well maintained and inspected regularly for...

Страница 2: ...e illustrations in this manual show the 8 2 metre long building only however all methodologies an principles match the 16 4 metre long building Building Overview Image 01 Housing Type Free Range Free...

Страница 3: ...ile 4250 O M Manual Iss 01 3 Item No 12 13 14 15 16 17 18 19 Item Name Wire Support Water Tank Support Slatted Floor Hoop Frame Inner Sheet Insulation Outer Sheet Polyboard Building Overview Image 02...

Страница 4: ...e to the structure during towing High abrasion surfaces can damage the surface of the skids where the ground is soft the building can sink sinking can inhibit towing and increase stress on the structu...

Страница 5: ...chor No 10 6 To insert the skid pins pass the pins through the holes in the skids and hammer them into the ground The holes in the skids pass through at an angle so that the pins can be safely hammere...

Страница 6: ...raised slatted floor the slatted floor is formed of interlocking plastic tiles fitted into a grid of supporting steel beams Nest boxes are placed in between the uprights and cannot be larger than 199...

Страница 7: ...n close proximity to the building Skids Skids should be checked before and after every towing procedure Ensure the bottom surface has not been excessively worn or damaged Inspect for fractures and ben...

Страница 8: ...to be re inserted once the building has been moved STEEL BAR SKID PIN AUGER ANCHOR ANCHOR BRACKET BULLDOG CLIPS DRAG FLAP DRAG FLAP DROP BOLT BRAIDED WIRE INTERNAL DRAG FLAP Step 2 Raising the drag f...

Страница 9: ...towing a building that has sunken into the ground can over stress the structure STROP CHAIN STROP LOOP CHAIN LINK Step 4 Tow the building Attach a strop or chain between the vehicle and the tow bar a...

Страница 10: ...on the auger bracket and wind into the ground using a metal bar passed through the box section on top of the anchor Wind the anchor down until the cross bar makes contact with the auger bracket Step...

Страница 11: ...rker and monitor on a twice daily basis It is recommended to tension ratchet straps over the building 500mm on either side of the tear to prevent the damaged area from increasing Tears greater than 70...

Страница 12: ...and the plastic edging strip around the floor perimeter is sitting in its correct position 10 Visually inspect underneath the slatted floor for uncommon features debris Twice yearly checks Visually in...

Страница 13: ...features debris 11 Visually inspect the full length of both skids inside and outside the building Ensure there is no build up of mud or bird waste on the skis Ensure the skids have not sunk into the g...

Страница 14: ...features debris 11 Visually inspect the full length of both skids inside and outside the building Ensure there is no build up of mud or bird waste on the skis Ensure the skids have not sunk into the g...

Страница 15: ...features debris 11 Visually inspect the full length of both skids inside and outside the building Ensure there is no build up of mud or bird waste on the skis Ensure the skids have not sunk into the g...

Страница 16: ...seated in the aluminium channel trapping the sheet 4 Check the personnel doors are seated well and that the hinges are moving freely 5 Check the personnel door latches are secure and latch properly 6...

Страница 17: ...Agile 4250 O M Manual Iss 01 17 Notes For emergencies general maintenance and assistance contact McGregor by phone or email 01962 772368 info mcgregorltd com...

Отзывы: