Agile 4250 O & M Manual Iss-01

10.

Moving the building

 

Step 5/ Replace the Anchors -

 Once the building has been successfully moved, install auger anchors and 

skid pins. To install the skid pins, pass the pins through the holes in the skids and hammer into the ground. 

The holes in the skids pass through at an angle so that the pins can be safely hammered through. To install 

the auger anchors, insert the tip of the anchor through the ring on the auger bracket and wind into the ground 

using a metal bar passed through the box section on top of the anchor. Wind the anchor down until the cross 

bar makes contact with the auger bracket. 

Step 6/ Remove the tow bar and reset the drag flaps - 

Check underneath the raised floor to ensure the 

floor supports are hanging in the correct position (vertically). The floor supports can be hanging but must be 

able to reach the ground below to provide their intended support. Finally remove the tow bar, lower the drag 

flaps and use the drop bolt to latch them shut.

 

REMOVE 

CHAIN 

ANCHOR PIN

AUGER BRACKET 

AUGER ANCHOR 

STEEL BAR

DROP BOLT

FLOOR SUPPORT

Содержание Agile 4250

Страница 1: ...be inspected and signed off by a responsible member of staff Once the installation is signed off it is the customers responsibility to ensure the product is well maintained and inspected regularly for...

Страница 2: ...e illustrations in this manual show the 8 2 metre long building only however all methodologies an principles match the 16 4 metre long building Building Overview Image 01 Housing Type Free Range Free...

Страница 3: ...ile 4250 O M Manual Iss 01 3 Item No 12 13 14 15 16 17 18 19 Item Name Wire Support Water Tank Support Slatted Floor Hoop Frame Inner Sheet Insulation Outer Sheet Polyboard Building Overview Image 02...

Страница 4: ...e to the structure during towing High abrasion surfaces can damage the surface of the skids where the ground is soft the building can sink sinking can inhibit towing and increase stress on the structu...

Страница 5: ...chor No 10 6 To insert the skid pins pass the pins through the holes in the skids and hammer them into the ground The holes in the skids pass through at an angle so that the pins can be safely hammere...

Страница 6: ...raised slatted floor the slatted floor is formed of interlocking plastic tiles fitted into a grid of supporting steel beams Nest boxes are placed in between the uprights and cannot be larger than 199...

Страница 7: ...n close proximity to the building Skids Skids should be checked before and after every towing procedure Ensure the bottom surface has not been excessively worn or damaged Inspect for fractures and ben...

Страница 8: ...to be re inserted once the building has been moved STEEL BAR SKID PIN AUGER ANCHOR ANCHOR BRACKET BULLDOG CLIPS DRAG FLAP DRAG FLAP DROP BOLT BRAIDED WIRE INTERNAL DRAG FLAP Step 2 Raising the drag f...

Страница 9: ...towing a building that has sunken into the ground can over stress the structure STROP CHAIN STROP LOOP CHAIN LINK Step 4 Tow the building Attach a strop or chain between the vehicle and the tow bar a...

Страница 10: ...on the auger bracket and wind into the ground using a metal bar passed through the box section on top of the anchor Wind the anchor down until the cross bar makes contact with the auger bracket Step...

Страница 11: ...rker and monitor on a twice daily basis It is recommended to tension ratchet straps over the building 500mm on either side of the tear to prevent the damaged area from increasing Tears greater than 70...

Страница 12: ...and the plastic edging strip around the floor perimeter is sitting in its correct position 10 Visually inspect underneath the slatted floor for uncommon features debris Twice yearly checks Visually in...

Страница 13: ...features debris 11 Visually inspect the full length of both skids inside and outside the building Ensure there is no build up of mud or bird waste on the skis Ensure the skids have not sunk into the g...

Страница 14: ...features debris 11 Visually inspect the full length of both skids inside and outside the building Ensure there is no build up of mud or bird waste on the skis Ensure the skids have not sunk into the g...

Страница 15: ...features debris 11 Visually inspect the full length of both skids inside and outside the building Ensure there is no build up of mud or bird waste on the skis Ensure the skids have not sunk into the g...

Страница 16: ...seated in the aluminium channel trapping the sheet 4 Check the personnel doors are seated well and that the hinges are moving freely 5 Check the personnel door latches are secure and latch properly 6...

Страница 17: ...Agile 4250 O M Manual Iss 01 17 Notes For emergencies general maintenance and assistance contact McGregor by phone or email 01962 772368 info mcgregorltd com...