Note:
Installation and putting into operation of the entire system must be carried out
exclusively by professional who guarantees proper operation of entire heating
system. In case of weak design of the system and eventual defaults during
installation carried out by mentioned professional, which again may cause improper
operation, complete material responsibility is transferred to such professional,not
manufacturer, representative or vendor.
Important
All connections must be well sealed and tightened. Prior to operation, complete
installation should be tested with water under pressure of 2,5bar.
At the mounting of safety valve, pay attention on direct connection with water and
sewage, and if valves (taps) are always open.
If armored hose is used for connection to sewage, it must be away of back side of
the stove due to high temperatures from the stove.
At the first firing up,
it is necessary to test accuracy of thermal exhaust valves by
short-term overheating up to 100°C, as well as accuracy of draft regulator, hot water
distribution to radiator.