Commissioning
UGW X-series
Commissioning
23 of 66
5
Commissioning
To commission and configure the gateway, you will also need:
•
Power supply unit for the UGW
•
Computer
•
Installed web browser and PDF reader
•
Network cable
The gateway provides an integrated web server for configuration.
Chapter 5.2.1 describes the steps required to access the web server.
5.1
Hardware installation
5.1.1
Assembly
The gateway has a mount at the rear for easy snap-on installation on 35 mm hat rails as per EN60715.
Install the gateway in the electrical cabinet and make sure that there is sufficient ventilation to ensure
the specified temperature range (0 to 45 °C).
5.1.2
Electrical installation
Connect the gateway to the green, two-pole port with a power supply as per the technical
specifications. An international power supply is optionally available if required.
5.1.3
Ethernet network installation
Connect the Ethernet network cable (RJ45 connector) to the LAN socket on the gateway. Use CAT5
UTP or STP cable (or equivalent). Avoid laying cables parallel to power lines, e.g. to motors,
frequency converters, etc.
5.1.4
RS485 network installation
Connect the RS485 network to the 4-pole RS485 port (orange). Observe the instructions for
connecting RS485 networks (MS/TP) according to 135-2004 (BACnet standard).
Caution:
Risk of injury due to electrical current on 230 V mains
• Do not use a defective power supply unit or connection lines.
• Do not switch the power supply on until the gateway has been installed and connected.
Attention:
The guarantee will become null and void if the gateway is connected to an unsuitable power
supply or the casing is opened. There are no controls inside the casing.
Attention:
Do not connect to a customer network before the gateway has been fully configured.