![MB 700 H Series Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/mb/700-h-series/700-h-series_operation-manual_1752089028.webp)
28
5
Minimum
Irradiation Value
Soiling calculation
will be done only if
solar irradiation
exceeds this
minimum value.
Default 250 W/mtr2
Table-4.6.1.1: Configuration – soling parameters
Details of configuration of soling measurement time are provided in table 4.6.1.2
below.
Sr. No
Parameter
Description
Remarks
1
Solar Noon Hours Solar noon hour
Set solar noon time at site.
This time will vary with
month of the year.
2
Solar Noon
Minutes
Solar noon minutes
3
Measure Time -
Minutes
Time in minutes
during which soling
parameters will be
measured.
This time together with solar
noon time will be used to
measure soiling.
Table-4.6.1.2: Configuration – soling measurement time
Note: Measurement of soling:
i)
Example: Solar noon is configured as 11 Hours and 30 minutes and
measurement time is set as 60 minutes.
Soiling measurement will start at 10.30AM and stop at 12.30PM.
ii)
As per IEC standard soiling should be calculated between sixty minutes before
solar noon and sixty minutes after solar noon.
4.6.2 Solar Panel Parameters
Datalogging of soling panels parameter can be configured clicking on tab “Solar
Panel” as shown in figure – 4.6.2 below:
Содержание 700 H Series
Страница 8: ...8 M Soiling station with modem H Soiling station with high wattage solar panel...
Страница 19: ...19...
Страница 37: ...37...