CHOKE SYSTEM MAINTENANCE SCHEDULE/CLEANING PROCEDURE CAT. 1A, NO. 032/83
Article Text
1983 Mazda RX7
For www.iluvmyrx7.com
Copyright © 1998 Mitchell Repair Information Company, LLC
Saturday, September 08, 2001 09:30AM
ARTICLE BEGINNING
TECHNICAL SERVICE BULLETIN
CHOKE SYSTEM SCHEDULED MAINTENANCE
Model: 1983 RX-7, 626, GLC
Bulletin No.: 032/83
Date: 04/07/83
Category: 1A
SUBJECT Choke System Scheduled Maintenance
DESCRIPTION
To prevent any sluggish movement of choke valve, choke system
scheduled maintenance has been added as follows:
Federal Models every 15,000 miles
California Models every 45,000 miles
CHOKE SYSTEM CLEANING PROCEDURE
1. Use a cleaning agent such as STP Spray Cleaner or equivalent for
cleaning.
2. Spray cleaning agent on choke linkage to remove dirt or grease. See
Fig. 1.
3. Spray cleaning agent on both ends of choke shaft while moving choke
valve slowly by hand.
4. Use compressed air to dry sprayed areas.
5. Apply spray lubricant such as WD-40 and move the choke lever
several times to check the free movement of the choke mechanism.
Fig. 1: Spraying Cleaner on Carburetor
END OF ARTICLE