1R
1L
2L
2R
27
51
53
27
51
53
49
27
51
49
27
51
15
82
82
76
6
Carefully unpack all parts of the delivery. Be sure enlist the help of a second person because some parts of
your exercise machine are bulky and heavy. Check the completeness of the fastening material (screws, nuts,
etc.) and the components before the individual assembly steps. Carefully carry out the installation, as damage
or defects that have arisen due to assembly errors are not covered by the warranty or guarantee under any
circumstances. Read the instructions carefully before assembly, follow the sequence of steps exactly and follow
the instructions for the individual assembly steps. The installation of the training device must be carried out by
responsible adults. Carry out the installation of your exercise equipment in a location that is level, clean and free
of obstructions during assembly. Carry out the assembly with two persons. Only start using your training device
after assembly has been fully completed.
Stept 1:
Gently lay the base frame on its side and attach the front feet (53 - marked “F”) with a M6x25 raised head bolt
(51) and a washer (27) to the bottom of the front two legs (1L / 1R). Then secure the rear feet (49 - marked “R”)
with a M6x25 bolt (51) and a washer (27) to the bottom of the rear two feet (2L / 2R).
Now place the two round cover caps (82) on the heads of the lock nuts (15).
Step 2:
Stand the base frame upright. Be sure to check the correct position of the feet installed in step 1. Insert the
locking pin (76) into the base frame as shown.
Assembly
Raised head bolt (51)
M6x15
4 pieces
Washer (27)
Ø12xØ6,5x1,0
4 pieces
Cover (82)
2 pieces
Locking pin (76)
1 piece