1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
39
STEP 7 - INSTALL CONTROL SWITCH - Continued
CONTROL SWITCH WIRING CONNECTIONS
(GRAVITY DOWN)
FIG. 39-1
CONTROL
SWITCH
JUNCTION
BLOCK
TERMINAL 1
GREEN
WIRE
WHITE
WIRE
BLACK
WIRE
STARTER
SOLENOID
FUSE
HOLDER
ASSEMBLY
NOTE:
Electrical lines must be run into pump box through sealing grommets
(FIGS. 39-1 & 39-2)
. To ensure a good seal on the electrical lines, never
cut the sealing grommets.
5.
Insert switch wiring through grom-
met on pump mounting plate
(FIGS.
39-1 & 39-2)
. Connect the switch
wiring to the pump assembly as
shown in
FIGS. 39-1 & 39-2
.
GROMMET
WIRING
HARNESS
CONTROL SWITCH WIRING CONNECTIONS
(POWER DOWN)
FIG. 39-2
POWER DOWN
MODULE
CONTROL
SWITCH
WIRING
HARNESS
GROMMET
FUSE
HOLDER
ASSEMBLY
STARTER
SOLENOID
GREEN
WIRE
BLACK
WIRE
WHITE
WIRE
DRIP
LOOP
DRIP
LOOP
Содержание GPTLR-25
Страница 90: ......