![MAVIG CT Expres Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/mavig/ct-expres/ct-expres_service-manual_1742669026.webp)
Page 26 of 54
5100054
BND01O03.docx
10.9.
Cable Routing
Figure 19 Cable Routing in the Extension
Arm
Figure 20 Cable Routing in the Ceiling
Column
•
Ceiling column, extension arm, spring
arm and injector column have to be
installed according to Sections 10.1,
10.4, 10.5 and 10.6.
•
All covers have to be disassembled
according to Sections 10.16, 10.17 and
10.18.
•
The cables
③
are pre routed through the
extension arm 6 and should protrude
out of the front
①/④
and rear cable
apertures
⑥
after installation of the
extension arm according to Section 10.4.
WARNING – Electric Shock
Damaged cables can energize
the carrier system:
•
The cables
③
must lay
next to each other without
crossing themselves.
•
The cables
③
must not be
twisted.
•
The cable insulations must
be undamaged.
1.
Route the cables
③
at the front through
the cable aperture downward to the
spring arm.
•
Start with the cable with the largest
cable plug.
2.
Route the cables into the aperture
⑥
and
③
through the ceiling column 4 to the
aperture
⑦
.
•
Make sure the cables are secured at
the cable fixing devices
②/⑤
.
•
Check that the external cables
③
are
not exposed to tensile stress in any
possible position and that the
extension arm can be freely moved.