MAULE AEROSPACE TECHNOLOGY, INC.
AIRPLANE FLIGHT MANUAL
MAULE
M-7-235B
SECTION III
NORMAL
PROCEDURES
3.1 PREFLIGHT INSPECTION: (Cont'd)
19. Right Wing & Controls…………………….…. INSPECT SAME AS LEFT WING
20. Wing Main & Aux Fuel Tank Drain……….… DRAIN (2)
21. Right Fuselage, Side, Top & Bottom…….… INSPECT FOR WRINKLES AS INDI-
CATION OF INTERNAL DAMAGE
22. Right Side Static Port………………………... CLEAR
23. Right Stabilizer……………………………….. CHECK ATTACHMENT POINTS &
STRUT
24. Right Elevator……………………………….... CHECK HINGE POINTS
25. Rudder……………………………………….... CHECK HINGE POINTS, CONTROL
ATTACHMENT & NAV LIGHT
26. Tailwheel…………………………………….... CHECK FOR INFLATION, ATTACH-
MENTS, REMOVE TIEDOWN
27. Left Elevator…………………………………... CHECK TAB CONTROLS & ALL
HINGE POINTS
28. Left Stabilizer…………………………………. CHECK ATTACHMENT POINTS &
STRUT
29. Left Fuselage, Side, Top & Bottom……….... CHECK FOR WRINKLES AS INDICA-
TION OF INTERNAL DAMAGE
30. Left Side Static Port………………………….. CLEAR
3.2
OPERATING CHECK LISTS:
A. BEFORE STARTING:
1. Seat Belts & Shoulder Harnesses……….…. FASTENED
2. Flaps………………………………………....… RETRACTED
3. Circuit Breakers……………………………..... CHECK
B. STARTING:
1. Parking or Toe Brakes……………….…….… ON
2. Fuel Selector Valve……………………..……. ON FULLEST TANK, OR BOTH IF
SAME QUANTITY
3. Throttle……………………………………..….. OPEN 1/4 INCH
4. Propeller Control…………………………..….. FULL INCREASE RPM
5. Mixture Control……………………………..…. RICH (SEE NOTE NEXT PAGE FOR
HOT START)
6. Anti-Collision Light………………………….... ON
7. BAT and ALT Switch……………………….... ON
8. Primer (O-540). ………………………………. AS REQUIRED
Primer (IO-540). …………………………….... AS REQUIRED USING BOOST PUMP
(SEE NOTE NEXT PAGE)
9. Mixture Control (IO-540- only)....................... FULL LEAN
10. Starter Switch…………………………………. TWIST FULL RIGHT TO ENGAGE
FAA APPROVED
DATE: 10/19/93
PAGE 8