ROLLER SOLUTIONS
— Use and Maintenance Instructions (cont.)
Page 4
III. TOOL ASSEMBLY / DISASSEMBLY
A. Die Wheel Assembly
1. Clean the slot and pocket in the die base. Remove any accumulated grit or debris.
2. Place the wheel assembly into the die base opening. Press down firmly on the wheel assembly until it seats into
the bottom of the die base shaft slot.
3. On the Rolling Shear tool, insert the roll pin.
4. Lubricate the wheel assembly and the die base opening liberally with a light to medium weight machine oil. On
Rolling Shear tool, make sure that the cutting wheel and the control wheel move freely and independently of
each other.
5. On the Rolling Shear and Rolling Pincher, reassemble the die cap. Make sure that the die cap moves up and
down freely.
6. Die height should measure 23mm for the Rolling Shear and Rolling Pincher, 20mm for the Rolling Rib and Rolling
Offset.
B. Die Wheel Disassembly
1. On the Rolling Shear and Rolling Pincher, remove the die cap by unscrewing the four M5 cap screws from the
bottom of the die base. The Retaining Ring also needs to be removed.
2. On the Rolling Shear, remove the roll pin.
3. Using a piece of soft brass or aluminium, drive out the wheel assembly. Be careful not to mark the cutting edges.
Control Wheel
Cutting Wheel
Roll Pin
Die Ca
p
Die Ca
p
Die Height
Die Height
Die Height
Die Height
Wheel Assembly
Wheel Assembly
Wheel Assembly
ROLLING RIB
ROLLING OFFSET
ROLLING PINCHER
ROLLING SHEAR
Dimensions in Inches(millimeters) © Mate Precision Technologies Inc. mate.com
LIT01152 Rev B
Mate Precision
Technologies
• 1295 Lund Boulevard • Anoka, Minnesota 55303 USA • Phone 763.421.0230 • 800.328.4492 • Fax 763.421.0285 • 800.541.0285
The Mate Logo is a registered trademark of Mate Precision
Technologies
Inc.
Mate Roller Solutions is a registered trademark
of Mate Precision
Technologies
Inc.