
2
MLI Ultra 12/1250, 24/1250
– User and Installation Manual
Table of contents
SAFETY INSTRUCTIONS ........................... 3
Safety warnings ........................................... 3
Safety guidelines .......................................... 4
GENERAL INFORMATION .......................... 5
Liability ......................................................... 5
Warranty ...................................................... 5
Disclaimer .................................................... 5
Identification label ........................................ 5
Correct disposal of this product .................... 5
PRODUCT DESCRIPTION .......................... 6
Status LEDs ................................................. 6
Battery switch-button (safety disconnect) ..... 7
Battery Management System (BMS) ............ 7
Charging ...................................................... 7
BASIC INSTALLATION ··························· 9
Unpacking .................................................... 9
Location ....................................................... 9
Materials needed ......................................... 9
Installation procedure for a single unit ........ 10
Adding the MLI Ultra to a CZone network ... 11
Auxiliary connector ..................................... 12
CONFIGURATION ..................................... 13
DIP switch settings ······························· 13
MasterBus DIP switch settings ··············· 13
CZone DIP switch settings ···················· 13
How to change the DIP switch
settings ············································ 13
Configuration in a MasterBus network ........ 14
Monitoring tab ···································· 14
Alarms tab ········································· 14
History tab ········································· 15
Configuration tab ································· 15
Events tab ········································· 16
Events sources ··································· 17
Event commands ································ 18
Stop Charge event ······························ 18
How to activate MasterBus
powering ·········································· 18
Configuration in a CZone network ............... 19
BUILDING A BATTERY BANK ................... 21
Series and parallel connections .................. 21
Configuration of a battery bank ................... 22
Using DIP switches (MasterBus only) ······ 22
Using MasterAdjust ····························· 24
Using CZone Configuration Tool ············· 24
STORAGE AND CARE ............................... 26
TROUBLESHOOTING ................................ 27
SPECIFICATIONS ...................................... 28
Technical specifications .............................. 28
– automatic behavior ........... 29
Characteristics ............................................ 29