- 18 -
a. Place 4 x Welded Leg sub-assemblies on to the inner verticals of the base frame,
b. Loosely screw these legs to front and rear verticles of the frame using 8Gx 1½” wood
screws. (4 per, total 16)
c. Place 2 x Short Base channels and then 2 x Long Base channels to form a frame on the
legs.
d. Join Short & Long base channels to leg using M8 Screw, Nut, and Washers. (3 on each
corner, total 12)
e.
Important - Check that the channels are 5mm above the front timber piece, as
shown in the detailed view “C”.
Содержание MATAKANA 1200
Страница 10: ... 9 ...
Страница 11: ... 10 ...
Страница 13: ... 12 ...
Страница 15: ... 14 ...
Страница 16: ... 15 ...
Страница 18: ... 17 ...
Страница 32: ... 31 ...
Страница 34: ... 33 ...