- 22 -
-
Build the chimney chase or extent the frame to the required height.
-
Build the ash storage under the timber base frame or on the side of the fire, if required.
-
The ash storage walls should be constructed using non-combustible material and should
have a minimum 50mm clearance from the metal frame channels in the base frame or a
50mm ventilated air gap on the sides.
-
Install the main flue and inner casing of the flue system
Содержание MATAKANA 1200
Страница 10: ... 9 ...
Страница 11: ... 10 ...
Страница 13: ... 12 ...
Страница 15: ... 14 ...
Страница 16: ... 15 ...
Страница 18: ... 17 ...
Страница 32: ... 31 ...
Страница 34: ... 33 ...