- 20 -
Assemble the ZC box around the fire by screwing various ZC sub-assemblies one by one
using 8G x ½” Screws provided, in the following order:
a. ZC Side LH Sub-assembly
b. ZC Rear LH Sub-assembly
c. ZC Rear RH Sub-assembly (has extra joggles flange)
d. ZC Side RH Sub-assembly
e. ZC Top Inner Heat Shield
f. ZC Top Outer Cover Panel
g. ZC Flue Adaptor Sub-assembly.
h. ZC Front Top Sub-assembly
Ensure that the flue adaptor is concentric with the spigot of the fire. Also, check that the entire front
face of ZC is flush with the front face of the timber base frame.
Содержание MATAKANA 1200
Страница 10: ... 9 ...
Страница 11: ... 10 ...
Страница 13: ... 12 ...
Страница 15: ... 14 ...
Страница 16: ... 15 ...
Страница 18: ... 17 ...
Страница 32: ... 31 ...
Страница 34: ... 33 ...