Z1
Q
R
2
0
SPRING CHANGE
FIG. 1
Set the knob (2) to the minimum preload
position.
Loosen the grub screw (3) fastening the
preload knob (2) by means of a 1.5 mm
Allen wrench. Remove grub screw from
cap assembly.
FIG. 2
Remove the stop ring (4) from the top of the
preload knob support with a small screw-
driver.
FIG. 3
Place the stanchion tube (13) in a vice
making sure not to damage or dent it in the
process and unscrew the cap (5) with a 26
mm open end wrench.
Remove the cap complete with O-ring (6)
from the stanchion tube.
2
3
4
5
6
13