![Marzocchi Z1 QR20 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/marzocchi/z1-qr20/z1-qr20_manual_1734743016.webp)
Z1
Q
R
2
0
SPRING AND CAP
FIG. 22
Fit the spring (9) into the stanchion tube.
Lubricate the O-ring (10) on the top of the
preload knob support and the O-ring (6)
on the cap (5).
9
10
6
8
5
11-29
5
Nm
12
FIG. 23
Move the plunger (7), in the cap, to the
minimum preload position.
Screw the cap (5) complete with lower
washer (8) onto the cartridge (11) or (29)
rod. Screw cap all the way in.
FIG. 24
Take the stanchion tube and fit the cap (5)
by hand. Place the stanchion tube in a vice
making sure it is not damaged or dented
in the process and tighten the cap to 12
Nm.