© Martin Engineering GmbH
11
M3814UK-03/16
Installation Preparation
4
Installation Preparation
4.1
Prior to Installation
4.1.1
Materials and tools required
In addition to the standard tools, the following special instruments
may be needed for the installation and maintenance of the
product.
•
Lifting device with a capacity greater than the weight of the
conveyor belt cleaner (note the weight on the delivery
note).
4.1.2
Preparatory measures
1.
Check the delivery with respect to the following:
•
Is the delivery complete? Is the number of pallets/cases/
containers the same as the number on the delivery note?
•
Does all the transport packaging appear to be undamaged?
Is there damage which may indicate that the contained
products may be damaged?
NOTE
Pay attention to the following checks and carry them out carefully
and completely.
The freight forwarder is responsible for any transport damage!
For any damage claims, please contact the freight forwarder.
NOTE
A product that has not been installed properly or correctly may dis-
rupt the conveyance process and contaminate the bulk material to
be transported.
The operator is therefore responsible for implementing the neces-
sary counter measures.
For applications involving dirt or impurities, please contact Martin
Engineering or
one of its representatives for advice.
Содержание QC 1 HD MT
Страница 2: ...Martin Engineering GmbH 2 M3814UK 03 16...