© Martin Engineering GmbH
17
M3814UK-03/16
Installation
8.
Repeat steps 1 to 6 on the opposite side of the chute wall.
5.2.2
Installing the tensioner
Observe the respective instructions on installing the spring tension-
er in the respective installation manual of the spring tensioner used.
(See chapter 2.1.4).
NOTE
This is the best possible installation position recommended by
Martin Engineering for the MARTIN
®
(PD) QC
™
#1 HD MT primary
cleaner to achieve optimum cleaning results. Should this not be
possible for structural reasons, the primary cleaner can, in consul-
tation with Martin Engineering, also be installed at an angle of 20°
above or below, but the installation radius must be adhered to in
every case.
Содержание QC 1 HD MT
Страница 2: ...Martin Engineering GmbH 2 M3814UK 03 16...