background image

         MPAAD User Manual  

11 

 

HEAD V 

Assembly  

 

The  structure  of  MPAAD  is  new  and  differs  from  the  structure  applied  to  the  most 
frequently  used  devices.  Therefore,  it  does  not  allow  for  the  use  of  available  assembly 
components  built  in  a  majority of  currently used parachute sets. However, completed tests 
proved  that  minor  adjustments  make  MPAAD  suitable  for  mounting  into  most  currently 
used parachute sets. 
 
Note: 
The  presentation  of  the  MPAAD device for the  leading  foreign  manufacturer  of  parachute 
equipment  has  not  yet  taken  place.  The  manufacturer’s  agreement  is  required  for  the 
mounting of a MPAAD device into a parachute system. 
 
 
 

HEAD VI 

Maintenance  

 

1.  

Special maintenance  

 

The  device  does  not  require  any  special  maintenance.  The  device  performs  continual 
automatic checks (battery, internal circuits, chopping cartridge). 

 
 

2.  

Proper function check  

 

The  user  can  easily  check  the  proper  operation  of  the  MPAAD  device  by  looking  at  the 
display. 
 

-

 

The real-time clock must correctly count down the time (stand-by mode). 

-

 

The  height  on  the  device  display  must  correspond  with  the  height  at  the  altimeter 
(jump-down mode).  

 
Note:  
Even a more thorough device check is relatively simple. However, it requires a certain level 
of knowledge. Therefore, it can be completed only by a person trained by the manufacturer.

  

PDF byl vytvo

ř

en zkušební verzí FinePrint pdfFactory 

www.fineprint.cz

Содержание MPAAD

Страница 1: ...MPAAD User Manual 1 User Manual Automatic Securing Device MPAAD 4th Edition In Jev ko in 10 2004 PDF byl vytvo en zku ebn verz FinePrint pdfFactory www fineprint cz...

Страница 2: ...3 User menu 4 Main parts 5 Location of the device HEAD III Technical data HEAD IV Contents 1 Deactivated device 2 Device activation 3 Device deactivation 4 Calibration 5 Stand by mode 6 Jump mode 7 Ad...

Страница 3: ...heck 3 Battery replacement 4 Chopping mechanism replacement 5 Device adjustment changes HEAD VII Service life and warranty conditions HEAD VIII Caution Placing the MPAAD securing device into a packing...

Страница 4: ...agnetic interferences MPAAD is a modern electronic micro processor controlled securing device that does not require any special maintenance and that features several additional functions The device ca...

Страница 5: ...tion takes place if the height above the ground is less than 270m and the fall rate is greater than 20 m s 1 The height lock is 450m TANDEM Activation takes place if the height above the ground is les...

Страница 6: ...The lower compartment contains a battery The middle compartment contains a pyrotechnic chopping mechanism The battery and the chopping mechanism can be replaced 5 Location of the device The device is...

Страница 7: ...evel AGL Activation height m 270 m Expert 270 m Beginner 560 m Tandem Activation rate m s 35 m s 1 Expert 20 m s 1 Beginner 35 m s 1 Tandem Height lock m 450 m Expert 450 m Beginner 900 m Tandem Accur...

Страница 8: ...0 Subsequently automatic calibration takes place and CAL appears on the display Afterwards the machine switches to a stand by mode During the activation procedure MPAAD checks the battery chopping mec...

Страница 9: ...djustment is indicated by letter b for instance 14 00b When the EXPERT adjustment is used the far right display field is empty 6 Jump mode Just a while after an airplane s start the device automatical...

Страница 10: ...nu beginning 01 888o opening height during the last jump 02 888J total number of jumps 03 88 remaining battery capacity in percents 04 3 65v battery voltage in volts 05 888d battery age in days 06 41b...

Страница 11: ...ounting of a MPAAD device into a parachute system HEAD VI Maintenance 1 Special maintenance The device does not require any special maintenance The device performs continual automatic checks battery i...

Страница 12: ...connectors should be limited only to the necessary replacement of the battery Unnecessary repeated disconnecting may result in the deterioration of the electrical parameters of the connectors Battery...

Страница 13: ...osely squashed flat so that the use of this side of the spanner for the screw tightening would be avoided Note Valid for the product dispatched from 08 2004 Check the device by turning it on 4 Choppin...

Страница 14: ...o cartridge into the counterpart piece placed in the upper left part of the device body Place the pyro cartridge into the central part of the device so that its whole height sinks in the groove PDF by...

Страница 15: ...ition The surface under the conductor is provided with glued on elastic rubber to insulate the cable Once the pyro cartridge has been replaced check the operation of the device by turning it on PDF by...

Страница 16: ...the parachute airplane must not descend below the height of the landing ground If the positive re calibration of the landing ground is applied the airplane must not descend below the height of the la...

Страница 17: ...a primary means for parachute opening The different use of the MPAAD device than is described in the operation manual may lead to its wrong function Considering a certain risk level that is an integra...

Страница 18: ...MPAAD User Manual 18 Pilot parachute PV 038 The size of the device is 100 x 62 x 20 mm PDF byl vytvo en zku ebn verz FinePrint pdfFactory www fineprint cz...

Страница 19: ...4 5 the cord creates the surface with which the pad aligns onto the body of the pyro cartridge Completing The device must be completed by an authorized person First insert the cord and the pad into th...

Страница 20: ...tion date __________________________________________________________ Reserve parachute type and size _____________________________________________ Production date _____________________________________...

Страница 21: ...______________________________ Estimated activation height ________________________________________________ Air temperature on the ground ______________________________________________ How much time d...

Страница 22: ...MPAAD User Manual 22 ________________________________________________________________________ PDF byl vytvo en zku ebn verz FinePrint pdfFactory www fineprint cz...

Отзывы: