Ground Water Heat Pump Applications

Open Loop - Ground Water Systems

Typical open loop piping is shown in figure 2. Shut off valves 

should be included for ease of servicing. Boiler drains or other 

valves should be “tee’d” into the lines to allow acid flushing 

of the heat exchanger. Shut off valves should be positioned to 

allow flow through the coaxial heat exchanger via the boiler 

drains without allowing flow into the piping system.  P/T plugs 

should be used so that pressure drop and temperature can be 

measured. Supply and return water piping should be limited to 

copper, HPDE, or other acceptable high temperature material. 

Note that PVC or CPVC material is not recommended as they 

are not compatible with the polyolester oil used in HFC-410A 

products.

Water quantity should be plentiful and of good quality. 

Consult water quality table for guidelines. The unit comes 

standard with either a copper or cupro-nickel source water 

heat exchanger. Consult table 3 for recommendations. In 

conditions anticipating heavy scale formation or in brackish 

water, a cupro-nickel heat exchanger is recommended. In 

ground water situations where scaling could be heavy or 

where biological growth such as iron bacteria will be present, 

an open loop system is not recommended. Heat exchanger 

coils may over time lose heat exchange capabilities due to 

build up of mineral deposits. Heat exchangers must only 

be serviced by a qualified technician, as acid and special 

pumping equipment is required. Desuperheater coils can 

likewise become scaled and possibly plugged. In areas with 

extremely hard water, the owner should be informed that the 

heat exchanger may require occasional acid flushing.  In some 

cases, the desuperheater option should not be recommended 

due to hard water conditions and additional maintenance 

required.

Water Quality Standards

Scaling potential should be assessed using the pH/

Calcium hardness method. If the pH <7.5 and the Calcium 

hardness is less than 100 ppm, scaling potential is low. If 

this method yields numbers out of range of those listed, the 

Ryznar Stability and Langelier Saturation indecies should be 

calculated. Use the appropriate scaling surface temperature 

for the application, 150°F [66°C] for direct use (well water/

open loop) and HWG (desuperheater); 85°F [29°C] for indirect 

use. A monitoring plan should be implemented in these 

probable scaling situations. Other water quality issues such 

as iron fouling, corrosion prevention and erosion and clogging 

should also be considered.

Expansion Tank and Pump

Use a closed, bladder-type expansion tank to minimize 

mineral formation due to air exposure. The expansion tank 

should be sized to provide at least one minute continuous 

run time of the pump using its drawdown capacity rating to 

prevent pump short cycling. Discharge water from the unit 

is not contaminated in any manner and can be disposed 

of in various ways, depending on local building codes (e.g. 

recharge well, storm sewer, drain field, adjacent stream 

or pond, etc.). Most local codes forbid the use of sanitary 

sewer for disposal. Consult your local building and zoning 

department to assure compliance in your area. 

The pump should be sized to handle the home’s domestic 

water load (typically 5-9 gpm [23-41 l/m]) plus the flow rate 

required for the heat pump. Pump sizing and expansion 

tank must be chosen as complimentary items. For example, 

an expansion tank that is too small can causing premature 

pump failure due to short cycling. Variable speed pumping 

applications should be considered for the inherent energy 

savings and smaller expansion tank requirements.

Water Control Valve

Always maintain water pressure in the heat exchanger by 

placing the water control valve(s) on the discharge line 

to prevent mineral precipitation during the off-cycle. Pilot 

operated slow closing valves are recommended to reduce 

water hammer. If water hammer persists, a mini-expansion 

tank can be mounted on the piping to help absorb the excess 

hammer shock. Insure that the total ‘VA’ draw of the valve 

can be supplied by the unit transformer. For instance, a slow 

closing valve can draw up to 35VA. This can overload smaller 

40 or 50 VA transformers depending on the other controls 

in the circuit. A typical pilot operated solenoid valve draws 

approximately 15VA. Note the special wiring diagrams later in 

this manual for slow closing valves.

Flow Regulation

Flow regulation can be accomplished by two methods. One 

method of flow regulation involves simply adjusting the ball 

valve or water control valve on the discharge line.  Measure the 

pressure drop through the unit heat exchanger, and determine 

flow rate from tables located later in this manual. Since the 

pressure is constantly varying, two pressure gauges may be 

needed. Adjust the valve until the desired flow of 1.5 to 2 gpm 

per ton [2.0 to 2.6 l/m per kW] is achieved. A second method 

of flow control requires a flow control device mounted on 

the outlet of the water control valve. The device is typically 

a brass fitting with an orifice of rubber or plastic material 

that is designed to allow a specified flow rate. On occasion, 

flow control devices may produce velocity noise that can be 

reduced by applying some back pressure from the ball valve 

located on the discharge line. Slightly closing the valve will 

spread the pressure drop over both devices, lessening the 

velocity noise.  

NOTE:  When EWT is below 50°F [10°C], a 

minimum of 2 gpm per ton (2.6 l/m per kW) is required.

Load Water Coil Low Temperature Limit Setting

For all open loop systems, if the leaving water is below 40°F 

(4.4°C), must use antifreeze and clip JW2 (factory setting-

water) to avoid freeze damage to the unit. See “Low Water 

Temperature Cutout Selection” in this manual for details on 

the low limit setting.

9

Содержание Century EarthPure HNW Series

Страница 1: ...www marsdelivers com Installation Operation and Maintenance HNW Series...

Страница 2: ...n Installation 8 Ground Water Heat Pump Applications 9 10 Water Quality Standards 11 Load Plumbing Installation 12 Hot Water Generator 13 15 Electrical Line Voltage 16 Electrical Low Voltage Wiring 17...

Страница 3: ...0 0 N F C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 MODEL TYPE HN HEAT CONTROLLER OPEN LOOP W TO W W WATER TO WATER CONFIGURATION UNIT SIZE 036 060 120 REVISION LEVEL A CURRENT 036 060 120 VOLTAGE CONTROLS CA...

Страница 4: ...e system damage and void product warranty Safety Warnings cautions and notices appear throughout this manual Read these items carefully before attempting any installation service or troubleshooting of...

Страница 5: ...nt should be stored in its original packaging in a clean dry area Store units in an upright position at all times The stack limit for HNW036 060 and 120 is three Unit Protection Cover units on the job...

Страница 6: ...urce Load 1 Swivel 1 1 2 FPT HWG in 1 Swivel 1 2 FPT Weight Operating lbs kg 348 158 360 163 726 329 Weight Packaged lbs kg 373 169 385 175 770 349 Water Volume Source Gallons Liters 0 96 3 64 1 33 5...

Страница 7: ...ever all components may be serviced from the front access panel if side access is not available 2 While clear access to all removable panels is not required installer should take care to comply with a...

Страница 8: ...or repairs The installation of water source heat pump units and all associated components parts and accessories which make up the installation shall be in accordance with the regulations of ALL author...

Страница 9: ...to prevent pump short cycling Discharge water from the unit is not contaminated in any manner and can be disposed of in various ways depending on local building codes e g recharge well storm sewer dr...

Страница 10: ...d with a factory or field supplied manual or electric shut off valve DAMAGE WILL OCCUR if shut off valve is closed during unit operation A high pressure switch must be installed on the heat pump side...

Страница 11: ...Levels 10 C 24 C 38 C Copper Cupronickel 20ppm NR NR 150 ppm NR NR 304 SS 400 ppm 250 ppm 150 ppm 316 SS 1000 ppm 550 ppm 375 ppm Titanium 1000 ppm 550 ppm 375 ppm Erosion and Clogging Particulate Siz...

Страница 12: ...ot Tub Applications Load side should be isolated with secondary heat exchanger constructed of anti corrosion material in all chlorine bromine fluid applications Potable Water Applications Load side sh...

Страница 13: ...one way meters 16mm OD 15 meters maximum Shut Off Valve 2 Shut off Valve 3 In Out Typically a single tank of at least 52 gallons 235 liters is used to limit installation costs and space However a dual...

Страница 14: ...all the water piping valves and air vent as shown in Figures 3 or 4 An appropriate method must be employed to purge air from the HWG piping This may be accomplished by flushing water through the HWG a...

Страница 15: ...mperature HWT must be 125 F 52 C Compressor Discharge Temperature CDT must be 125 F 52 C both conditions are needed for PR relay contacts to close and pump to run 3 Turn on the heat pump and allow it...

Страница 16: ...ng diagram Consult the electrical data table Table 4 for correct fuse size Transformer The units are factory wired for 230 Volt If supply voltage is 208V transformer must be rewired by installer as il...

Страница 17: ...valve is fully open before compressor starts should be used Valve should also be normally closed type so water flows through only when unit is operating A slow closing valve may be required to help r...

Страница 18: ...Installation Operation Maintenance HNW Series 18 HNW036 HNW060 Electrical Wiring Diagram 96B0223N11...

Страница 19: ...Installation Operation Maintenance HNW Series 19 HNW120 Electrical Wiring Diagram 96B0225N11...

Страница 20: ...field configuration options DIP switches should only be changed when power is removed from the CXM control DIP switch 1 Unit Performance Sentinel Disable provides field selection to disable the UPS f...

Страница 21: ...sure loss of charge fault The low pressure switch input is bypassed for the initial 120 seconds of a compressor run cycle Low pressure lockout code 3 Source Water coil low temperature LT1 The LT1 ther...

Страница 22: ...T2 thermistor code 9 CXM Controls Diagnostic Features The LED on the CXM board advises the technician of the current status of the CXM control The LED can display either the current CXM mode or the la...

Страница 23: ...eratures which are suitable for initial unit commissioning in an environment where the flow rate and water temperature is not yet stable and to avoid nuisance shut down of the units freeze and refrige...

Страница 24: ...purged from the system Air in the system can cause poor operation or system corrosion Cooling Tower Boiler Check equipment for proper setpoints and operation Standby Pumps Verify the standby pump is p...

Страница 25: ...ry within a few minutes after the unit has begun to operate d Verify correct water flow by comparing unit pressure drop across the heat exchanger versus the data in Table 8 Refer to Table 7 Check the...

Страница 26: ...for the source and compared to submittal data capacity pages The formula for HR for systems with water is as follows HR TD X GPM X 500 where TD is the temperature difference between the entering and l...

Страница 27: ...8 23 14 20 8 17 70 114 129 225 227 24 32 14 20 9 19 80 117 135 228 230 32 41 14 20 9 20 3 0 50 87 101 199 203 12 18 12 18 9 12 8 16 60 91 113 203 207 12 18 12 18 8 17 70 95 124 204 216 16 34 12 18 9 1...

Страница 28: ...7 11 6 18 100 102 110 384 401 6 13 7 11 6 17 120 106 114 475 491 6 13 7 11 5 17 3 0 60 95 107 215 256 6 14 7 15 5 9 7 19 80 101 110 310 326 6 14 7 15 7 19 90 103 112 329 376 6 14 7 15 6 19 100 105 11...

Страница 29: ...iodic cleaning to remove scaling Use standard cleaning procedures which are compatible with cupro nickel and copper Hot Water Generator Coils See water coil maintenance for load water coil If the pota...

Страница 30: ...Temp 6 Suction Pressure 6a Saturation Temp 6b Superheat 7 Discharge Temp 8 Discharge Pressure 8a Saturation Temp 8b Subcooling 9 Liquid Line Temp 10 Load Water In Temp 11 Load Water Out Temp H Temp D...

Страница 31: ...date of shipment from the factory REMEDY PROVIDED BY THE LIMITED EXPRESS WARRANTY The sole remedy under the Limited Warranty is replacement of the defective part If replacement parts are required with...

Страница 32: ...HU GGLWLRQDOO WKH LQVWDOOHU LV UHVSRQVLEOH IRU YHULI LQJ GLPHQVLRQDO GDWD RQ WKH DFWXDO SURGXFW SULRU WR EHJLQQLQJ DQ LQVWDOODWLRQ SUHSDUDWLRQV QFHQWLYH DQG UHEDWH SURJUDPV KDYH SUHFLVH UHTXLUHPHQWV D...

Отзывы: