Technical Notice CSO/CPO V1.1 / 10.14
3 CPO 140 model
3.2
Handling
The unit must be transported flat and must not
sustain any shocks.
3.3
Installation
The unit is normally installed close to the machine
being cooled, as indicated on the installation
plans.
During the installation, allow for a free space of
about 0.5 m around the refrigeration unit. This dis-
tance must be 1 m in front of the exhaust fan. With
these precautions, both ventilation and mainte-
nance access will be made easier.
3.3.1
Hydraulic connections
Except where specifications state otherwise, the
connections between the refrigeration unit and the
machine being cooled can be made with pipes
with a cross-section diameter at least equal to that
indicated in the technical specifications.
See section “3.1.2.5 Hydraulic circuit” on page 17.
3.3.2
Electrical connections
E
LECTROCUTION
The machine cabinet must be disconnected
from power while connecting the cables.
Power cable installed with a 3m length (or accor-
ding to customer specifications).
3.4
Commissioning
The unit has been checked, tuned and tested in
our workshops.
A.
Make the hydraulic and electrical connections.
B.
Make sure the oil circulates in the unit.
C.
Start up the unit (1).
D.
Check the rotation direction of the exhaust fan and
the pump, if available (option C).
Fig. 3-2 : Start-up
(1)