![Markes International Unity 2 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/markes-international/unity-2/unity-2_installation-manual_1727983015.webp)
QUI-1056
Page 15
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
E:
www.markes.com
c.
Gently feed the fused silica through the 1/16” nut and ferrule until the mark is reached.
d.
Tighten the nut to trap the fused silica and then tighten a further 1/2 turn using one of the 8 mm
wrenches (spanners) provided in the shipping kit.
CAUTION
: Do not over tighten or the ferrule will become distorted
5.
Secure Transfer Line Assembly to UNITY 2
a.
Carefully bring the clamp plate, PTFE plate and shield tube down into the position with the shield tube
covering the union nut.
b.
The shield tube should be positioned such that the 1/16th side tubing projects though one of the
cutouts.
c.
Push the clamp plate and PTFE plate down on to the 2 exposed threads and secure with 2 x M4 nuts
(
SERZ-NM4FSS
)