SP9 ServiceManual.docx 06/02/2015
Page 6 of 42
When mounting Twin Head Units, ensure a minimum of 100mm between units, not just
between cut-outs, as indicated in Figure 2, below.
The distance between the SP9 Head Unit and the Under Counter unit should be NO MORE
than 400mm.
Max distance between head and boiler refers to the length of the tubing. Since the tubing is
never a straight line, actual distance between head and boiler can be substantially less than
400mm, depending on alignment of units.
Drainage
– Connect drip tray, boiler vent and head vent to a drain via a tundish or some
other method of open connection to drain. Do not connect these three outlets together in a
closed configuration using T-piece or double T-
piece. Always allow these to “breath”.
Figure 2.
Содержание 1000830
Страница 7: ...SP9 ServiceManual docx 06 02 2015 Page 7 of 42 Figure 3 Figure 4...
Страница 11: ...SP9 ServiceManual docx 06 02 2015 Page 11 of 42 CONTROLS Figure 6 BREWING...
Страница 20: ...SP9 ServiceManual docx 06 02 2015 Page 20 of 42...
Страница 21: ...SP9 ServiceManual docx 06 02 2015 Page 21 of 42...
Страница 24: ...SP9 ServiceManual docx 06 02 2015 Page 24 of 42 Internal Component Map Figure 13...
Страница 31: ...SP9 ServiceManual docx 06 02 2015 Page 31 of 42 15 ELECTRICAL SCHEMATICS...
Страница 32: ...SP9 ServiceManual docx 06 02 2015 Page 32 of 42...
Страница 33: ...SP9 ServiceManual docx 06 02 2015 Page 33 of 42 16 SPARE PARTS SCHEMATICS...
Страница 35: ...SP9 ServiceManual docx 06 02 2015 Page 35 of 42...
Страница 36: ...SP9 ServiceManual docx 06 02 2015 Page 36 of 42...
Страница 37: ...SP9 ServiceManual docx 06 02 2015 Page 37 of 42 SP9 Head Unit Spare Parts...
Страница 39: ...SP9 ServiceManual docx 06 02 2015 Page 39 of 42 18 DIMENSIONED DRAWINGS...
Страница 40: ...SP9 ServiceManual docx 06 02 2015 Page 40 of 42...
Страница 41: ...SP9 ServiceManual docx 06 02 2015 Page 41 of 42 19 CUT OUT TEMPLATE...
Страница 42: ...SP9 ServiceManual docx 06 02 2015 Page 42 of 42 Installation Cut Out Template...