
ENG
3
REFERENCE STANDARDS
- Leg. Decree 09.04.2008 no. 81 (O.G. no. 101 dated 30.04.08) “Consolidating act on health and
safety in the workplace”.
- EN 1004 (July 2005) “Mobile access and working towers) composed of prefabricated elements.
Materials, dimensions, design loads, safety and performance requirements”;
- EN 1298 (February 1996) “Mobile access towers. Regulations and guidelines for preparation of an
instructions manual”;
- Leg. Decree 06.09.2005 no. 206 (O.G. no. 235 on 08.10.05 – Ordinary Supplement no. 162)
“Consumers’ Code”.
DESIGNATION, CLASS, CAPACITY
System 120x200 working tower EN 1004 – 3 – 8 / 12 XXCD.
System 120x180 working tower EN 1004 – 3 – 8 / 12 XXCD.
System 100x200 working tower EN 1004 – 3 – 8 / 8,5 XXCD.
System 100x180 working tower EN 1004 – 3 – 8 / 8,5 XXCD.
System 75x200 working tower EN 1004 – 3 – 7 / 7 XXCD.
System 75x180 working tower EN 1004 – 3 – 7 / 7 XXCD.
manufactured in compliance with Leg. Decree 81/08 and Technical Standard EN 1004
Class of loads distributed uniformly equal to “3” (2.0 KN/m2);
•
max height work platform without stabilizers: m 2,50 / max height work platform with stabilizers:
m 6,10 (H max tower: m 3,50).
•
SYSTEM 120: max height work platform with stabilizers: m 8,00 outside of buildings, m 12,00
inside of buildings
•
SYSTEM 100: max height work platform with stabilizers: m 8,00 outside of buildings, m 8,50
inside of buildings
•
SYSTEM 75: max height work platform with stabilizers: m 7,00 outside of buildings and inside
of buildings
•
The sum of the loads relating to each surface must not exceed the overall value of the load
permitted for the scaffolding.
•
Minimum height clearance between work platforms is: m 1,90.
•
Maximum vertical distance between work platform: m 4,20.
•
Maximum vertical distance between the ground and the first level: m 4,60.
Содержание System 100x180
Страница 25: ...ENG 25...