Marchetti System 100x180 Скачать руководство пользователя страница 20

20

www.marchetti.eu

Always try to increase the dimensions of the floor contact surface area. Close the two front clampson 

on the stabilizer, making sure it rests firmly on the  ground, and then tighten the corresponding eyebolt 

nuts. Repeat the same sequence of operations for the other three tower uprights;

• As the tower is being assembled, pay careful attention to place the floor pieces in a position that 

allows the person working at height the maximum possible safety and freedom of movement. The 

person should have the possibility to anchor the safety belt worn easily;

• Once the tower has been assembled, fit the work platforms, toeboards and lateral protections at the 

desired heights; make sure that the anti-lifting devices (hooks), located at the ends, are in the correct 

position of the anti- detachment;

• The lateral protections are composed of 2 long frames  and  2 short frames  The two frames must be 

fitted first, parallel to the long sides of the tower. Rest them on the cross-pieces of the load bearing 

frames, making sure the top pipe is one meter from the walking surface. Install the short frames parallel 

to the short side of the mobile access tower, hooking  them up to the long guardrails at the top end, 

and to the latches positioned on the latter at the bottom side;

• Once assembly is complete, insert the caps (packaged together with this manual, in the Wheel-bearing 

section) in the terminal horizontal bracing, to preserve the scaffolding.

• For passage platform use the steel guardrail bar, with anti-detachment device at the ends. Place the 

bars on the rung and make sure that the hooks are in the correct anti-detachment position.

• During assembly, to raise the components for the upper section, it is advisable to use ropes or cables 

rated for the application, taking care never to pass up more than one component at a time;

• If access to the work platforms is to be gained by inclined rung or step ladders, these must be attached 
with the two hooks at the top end to the cross piece on wich the work platform

DISASSEMBLY

• To dismantle the mobile access tower, follow the assembly instructions in reverse order;
•  Lower mobile access tower components from above using ropes, cables or other suitable means,  

avoiding at  all times abrupt impact with the ground.

STABILITY

• Erect and use the mobile access towers only in the absence of windy conditions;
• Fit the stabilizers, based on the configuration and height to be reached.
• The maximum horizontal load capacity (e.g. applied by effect of work in progress in an adjacent 

structure) is 25 kg, understood as the sum of the loads applied by the various operators working on 

the tower;
• If the tower must be left unattended in position due to temporary interruption of work or windy 

conditions, anchor it firmly to a fixed, stable structure;

Содержание System 100x180

Страница 1: ...the current standard on health and safety in the workplace Leg Decree 09 04 2008 no 81 Code 10731 CUSTOMER ASSISTANCE DOCUMENT NR 35 REV 8 OF 27 08 2020 MARCHETTI S r l Via Piemonte 22 06062 Citt del...

Страница 2: ...nt to applicable norms The guarantee is immediately effective and is ratified by the invoice accompanying the goods A product found to be faulty is guaranteed We shall accept no responsibility for pro...

Страница 3: ...EN 1004 3 7 7 XXCD System 75x180 working tower EN 1004 3 7 7 XXCD manufactured in compliance with Leg Decree 81 08 and Technical Standard EN 1004 Class of loads distributed uniformly equal to 3 2 0 KN...

Страница 4: ...Super 35 stabilizers must be fitted to towers with work platform above m 5 00 and when the tower is completely exposed to the wind for example in the middle of a square next to a structure such as a...

Страница 5: ...e prototype which has surpassed rigidity testing pursuant to Appendix A of the Technical Standard EN 1004 2005 and that it was subject with a positive outcome with the ASSESSMENT as outlined in point...

Страница 6: ...4 4 5 30523 Handgrip screw M14x50 0 14 4 4 4 4 4 4 4 4 20583 TOWER 10 20556 Bearing frame 120 9 50 2 4 6 8 10 12 14 16 11 20563 Connecting brace 200 3 90 2 4 6 8 10 12 14 16 12 20564 Diagonal bracing...

Страница 7: ...t trapdoor 180x51 13 64 1 1 1 2 2 2 3 3 27 Short toeboard 180 1 59 2 2 2 4 4 4 6 6 20749 COMPLETE GUARDRAILS 17 20631 Long guardrail 180 5 10 2 2 2 2 2 2 2 2 18 20784 Short guardrail 120 2 30 2 2 2 2...

Страница 8: ...rchetti eu COMPONENTS ELEMENTS 28 Guardrail bars Work platform Tower H 1 50 m 10 12 17 18 Guardrail 3 2 4 5 Extractable base 11 Terminal tower H 0 90 m 22 21 11 26 27 24 25 20 19 SYSTEM 120X200 SYSTEM...

Страница 9: ...FIGURATION INSIDE OF BUILDING CONFIGURATIONS A1T A2T A3T A4T A5T B6T B7T H max mobile tower m 2 90 4 40 5 90 7 40 8 90 10 40 11 90 H max work platform m 1 90 3 40 4 90 6 40 7 90 9 40 10 90 H tower H 1...

Страница 10: ...3 50 4 4 4 4 4 4 5 30523 Handgrip screw M14x50 0 14 4 4 4 4 4 4 20587 TOWER 6 20558 Bearing frame 100 8 40 2 4 6 8 10 12 7 20563 Connecting brace 200 3 90 2 4 6 8 10 12 8 20564 Diagonal bracing 200 1...

Страница 11: ...trapdoor 180x36 11 22 1 1 1 2 2 2 23 Short toeboard 100 1 39 2 2 2 4 4 4 20747 COMPLETE GUARDRAILS 15 20631 Long guardrail 180 5 50 2 2 2 2 2 2 16 20785 Short guardrail 100 2 00 2 2 2 2 2 2 GUARDRAIL...

Страница 12: ...marchetti eu COMPONENTS ELEMENTS 24 Guardrail bars Work platform Tower H 1 50 m 6 8 15 16 Guardrail 3 2 4 5 Extractable base 7 Terminal tower H 0 90 m 10 9 7 22 23 20 21 18 17 SYSTEM 100X200 SYSTEM 1...

Страница 13: ...T A5T H max mobile tower m 2 90 4 40 5 90 7 40 8 90 H max work platform m 1 90 3 40 4 90 6 40 7 90 Tower H 1 50 m n 1 2 3 4 5 Tower H 0 90 m n 1 1 1 1 1 Work platform with parapet n 1 1 2 2 2 Complete...

Страница 14: ...1 1 1 2 2 12 Short toeboard 75 1 60 2 2 2 4 4 13 Long toeboard 200 4 60 2 2 2 4 4 20750 COMPLETE GUARDRAILS 14 20632 Long guardrail 200 5 50 2 2 2 2 2 15 20786 Short guardrail 75 1 70 2 2 2 2 2 GUARDR...

Страница 15: ...80x60 12 50 1 1 1 2 2 12 Short toeboard 75 1 60 2 2 2 4 4 13 Long toeboard 180 4 20 2 2 2 4 4 20751 COMPLETE GUARDRAILS 14 20631 Long guardrail 180 5 10 2 2 2 2 2 15 20786 Short guardrail 75 1 70 2 2...

Страница 16: ...ww marchetti eu COMPONENTS ELEMENTS 19 Guardrail bars Work platform Tower H 1 50 m 6 8 14 15 Guardrail 3 2 4 5 Extractable base 7 Terminal tower H 0 90 m 10 9 7 11 12 13 17 16 SYSTEM 75X200 SYSTEM 75X...

Страница 17: ...ONS A1T A2T A3T A4T H max mobile tower m 2 90 4 40 5 90 7 40 H max work platform m 1 90 3 40 4 90 6 40 H tower H 1 50 m n 1 2 3 4 H tower H 0 90 m n 1 1 1 1 Work platform with parapet n 1 1 2 2 Comple...

Страница 18: ...ities are listed Damaged components must not be used Only original components indicated by the manufacturer may be used SAFETY PLATFORM D Lgs 09 04 2008 n 81 Sez IV art 128 The Safety Platform constru...

Страница 19: ...irst two lateral frames First position the 2 long toeboards parallel to the walking surface Now fit the 2 short toeboards into the respective housings found in the long boards At this point at least o...

Страница 20: ...y is complete insert the caps packaged together with this manual in the Wheel bearing section in the terminal horizontal bracing to preserve the scaffolding For passage platform use the steel guardrai...

Страница 21: ...ngs must be secured to the building or other structure Tools and materials must be lifted from the inside of the tower from one platform to another through the trapdoors using manual traction with app...

Страница 22: ...e in a covered and sheltered place is recommended to reduce damage due to corrosion over time USE ACCORDING TO D LGS 81 08 All the mobile access towers pursuant to D Lgs 81 08 but not to EN 1004 stand...

Страница 23: ...eir use in the case of use according to EN 1004 refer to the handbook attached for the two towers of the System 120 series the maximum work platform height allowed is 7 90 m if used outside buildings...

Страница 24: ...The maximum height difference between the walkway of the scaffolding and the landing surface must not exceed 16 cm If necessary correct the height of the scaffolding only using the methods indicated i...

Страница 25: ...ENG 25...

Страница 26: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Страница 27: ...Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of Instru...

Страница 28: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Страница 29: ...Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of Instru...

Страница 30: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Страница 31: ...Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of Instru...

Страница 32: ...32 www marchetti eu www marchetti eu MARCHETTI S r l Via Piemonte 22 06062 Citt della Pieve Perugia Italy info marchetti eu www marchetti eu...

Отзывы: