60
Montage- und Betriebsanleitung
Installation and Operating Instructions
EN
Screw the threaded pins with medium-strength thread locking compound
(adhesive) into the cooled tool holder at “Pos. 1” (see
Fig. 16: Coolant
Supply FFoorrm
m AADD//JJDD).
Remove any adhesive residues.
After the curing time of the adhesive, check the threaded pins for secure
fitting and rebalance the tool holder, if necessary.
Use a pull stud with coolant bore for the machine-side sealing of the tool
holder.
Coolant Supply FFoorrm
m AADD//JJDD
RREESSU
ULLTT
Coolant supply is changed over to FFoorrm
m AADD//JJDD.
55..66
FFiinnee bbaallaanncciinngg tthhee sshhrriinnkk cchhuucckk
If the basic balancing quality of the shrink chuck is not sufficient, the shrink chuck can be rebalanced using fine balancing
screws in the balancing threaded holes of the shrink chuck. Depending on the diameter of the shrink chuck, four to six bal-
ancing threaded holes are available.
IIN
NFFO
ORRM
MAATTIIO
ON
N
If you have any questions about fine balancing of the shrink chuck, please contact WTE Service.
Montage- und Betriebsanleitung
Installation and Operating Instructions
61
EN
66
CCaarree aanndd m
maaiinntteennaannccee
•
Protect the shrink chuck against corrosion during storage.
•
Repairs must only be performed at WTE.
•
Before use clean location bore and taper.
77
DDiissppoossaall
Once the shrink chuck reaches the end of its service life, it must be disposed of with due care for the protection of the envi-
ronment. The shrink chuck can also be sent to WTE for proper disposal.
Montage- und Betriebsanleitung
Installation and Operating Instructions
61
EN
Содержание ThermoChuck
Страница 1: ...Montage und Betriebsanleitung Installation and Operating Instructions Schrumpffutter Shrink chuck ...
Страница 2: ......
Страница 62: ......
Страница 63: ......