SET-UP
OPERATOR MANUAL
NBT50
4-8
Published 03-23-2018 Control # 243-14
1.
Using lift function, lower boom so that side attachment
pins (6 & 7, Figure 4-3) are easily accessible from the
ground.
NOTE:
When lowering the boom below horizontal, two
persons may be required. With the telescope
control in neutral, the boom may slide out when
below horizontal.
2.
Two section jib - For manually extendable jibs, pull jib
retaining pin (9, Figure 4-3) and fully retract extendable
2
nd
section into the tele 1. Retraction of 2
nd
section may
be facilitated by attaching loadline wedge socket to jib
nose. Slowly activate the hoist up function until the 2
nd
section is fully retracted.
3.
Two section jib - Reinstall jib retaining pin (9, Figure 4-3)
through the 1
st
and 2
nd
section jib assembly and install
spring clip.
4.
Remove loadline from jib sheave case. Place loadline in
area to avoid possible damage from stow procedure.
5.
Disconnect A2B wire connector at rear of the jib. Re-
connect A2B switch connector on boom tip. Move
weight/chain assembly to boom tip see Figure 4-6.
6.
Attach tag line to sheave case end of jib.
7.
Remove spring clips from left side attachment pins (7,
Figure 4-3 and Figure 4-4) on both upper and lower jib
lugs.
8.
Remove jib swing pin (5, Figure 4-3) from the boom
nose.
9.
Remove left side attachment pins (7, Figure 4-3 and
Figure 4-4) from upper and lower jib lugs. Do not remove
right side attachment pins (6) at this time. The right side
attachment pins (6) will be used as a pivot point to swing
jib into stowed position. A slight hammer strike may be
necessary to remove pins.
10.
Raise the boom to the horizontal position.
11.
Extend boom approximately 1 ft (0.3 m).
12.
Using tag line attached to jib sheave case, slowly swing
jib into stowed position (parallel with tele 1 boom), the
right side attachment pins (6, Figure 4-3) are the jib pivot
points during this operation.
:
13.
Install jib swing pin (5, Figure 4-3) with spring clip
through jib lug and boom sheave case holes. This pin
will keep the jib assembly in line (parallel) with the I
st
section boom.
NOTE:
Jib swing pin (5, Figure 4-3) does not retain the jib
in its stowed position on the I
st
section boom.
14.
Using boom telescope function, slowly retract boom.
The jib stowage bracket (2, Figure 4-3) on the side of the
jib will engage the hook bracket (3) on the side of the tele
1 boom; first lifting the jib and then engaging the jib stow
bracket (2) and the hook bracket (3) completely upon full
retraction of the boom.
Ensure boom is fully retracted.
15.
Install stow pin (1, Figure 4-3) with spring clip into the jib
stowage bracket (2) on the jib. Complete engagement of
stow brackets and proper installation of stow pin (1) is
critical for secure jib stow attachment.
16.
Remove right side attachment pins (6, Figure 4-3) from
upper and lower jib lugs. A slight hammer strike may be
necessary to remove pins.
17.
Reinstall loadline over boom sheave case.
NOTE:
When the jib is stowed on side of crane, always
leave the ram and handle sleeve of the alignment
jack pushed all the way in to reduce exposure to
rusting.
JIB REMOVAL
NOTE:
The hoist cable must be routed over the mast
assembly and under the roller on the mast for all
configurations.
DANGER
Visually check all pin positions and make sure the jib is
fully retracted into side stow brackets, jib stow attachment
is secure, and all pins and spring clips are in their proper
locations. Failure to properly secure the jib during stowing
and erecting may allow the jib to fall. Serious personal
injury or death could result.
Always have at least one, if not both of the following in
place at all times:
•
Side stow bracket completely engaged into stow
hook with stow pin A properly in place.
•
Both pins (6, Figure 4-3) in upper and lower jib holes
properly in place through mating holes on boom tip.
!
CAUTION
Always use proper eye protection during this step.
CAUTION
Use caution when swinging jib to avoid unnecessary
impact with tele 1 boom.
CAUTION
Always use proper eye protection during this step.
Содержание National Crane NBT50 Series
Страница 1: ...Operator Manual National Crane NBT50 Series ...
Страница 2: ......
Страница 10: ...TOC 6 TABLE OF CONTENTS OPERATOR MANUAL NBT50 THIS PAGE BLANK ...
Страница 12: ...INTRODUCTION OPERATOR MANUAL NBT50 1 2 Published 03 23 2018 Control 243 14 FIGURE 1 1 7650 66 ...
Страница 50: ...2 36 Published 03 23 2018 Control 243 14 SAFETY PRECAUTIONS NBT50 OPERATOR MANUAL 8496 1 FIGURE 2 6 ...
Страница 82: ...CONTROLS AND OPERATING PROCEDURES OPERATOR MANUAL NBT50 3 22 Published 03 23 2018 Control 243 14 FIGURE 3 14 ...
Страница 134: ...MAINTENANCE CHECKLIST OPERATOR MANUAL NBT50 6 12 Published 03 23 2018 Control 243 14 THIS PAGE BLANK ...
Страница 157: ......
Страница 158: ......