TMS800E13 OPERATOR MANUAL
SET-UP AND INSTALLATION
4
Published 02-06-2014, Control # 495-00
8.
Remove tag line before operating crane.
NOTE:
Reeve the hoist cable as described under rigging
and unrigging procedure in this section.
Stowing Procedure
17.1 m (56 ft) Jib
1.
Lower boom below horizontal.
2.
Attach tag line to stinger nose Figure 4-36.
3.
Disconnect RCL connection (1, Figure 4-37). Stow the
cable in the 23 ft (7 m) section.
4.
Remove retainer clip and remove the left side stinger
retaining pin (1, Figure 4-38). Place pin in holder.
5.
Raise boom to slightly above horizontal.
6.
Using tag line to control movement of stinger, swing
stinger into stowed position Figure 4-39.
7.
Raise boom slightly above horizontal.
8.
Connect stowage link (1, Figure 4-40) to stinger using
pin (2) and retainer clip (3).
9.
Remove tag line from stinger.
WARNING
To prevent serious injury or death, do not stand on
decking until extensions are secure.
6642-23
FIGURE 4-36
1
6642-28
FIGURE 4-37
1
6642-26
FIGURE 4-38
1
6642-29
FIGURE 4-39
6642-24
FIGURE 4-40
3
2
1
Reference Only
Содержание Grove TMS800E13
Страница 5: ...Operator Manual Grove TMS800E13 R e f e r e n c e O n l y ...
Страница 6: ...R e f e r e n c e O n l y ...
Страница 148: ...SET UP AND INSTALLATION TMS800E13 OPERATOR MANUAL 38 Published 02 06 2014 Control 495 00 R e f e r e n c e O n l y ...
Страница 162: ...LUBRICATION TMS800E13 OPERATOR MANUAL 14 Published 02 06 2014 Control 495 00 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 166: ...OPERATOR MANUAL TMS800E13 APL 2 R e f e r e n c e O n l y ...
Страница 167: ...R e f e r e n c e O n l y ...
Страница 168: ...R e f e r e n c e O n l y ...