GROVE
15
TMS800E13 OPERATOR MANUAL
SET-UP AND INSTALLATION
4
Published 02-06-2014, Control # 495-00
6.
Remove retainer clip (1, Figure 4-16) from the pin
attaching the 7m (23 ft) section to the base section.
.
7.
Remove the stowage pin (1, Figure 4-17).
8.
Stow the pin (1, Figure 4-18) in pin holder (2) provided
on the swingaway extension.
9.
Remove the jib stowage controller (1, Figure 4-19) from
behind the seat in the superstructure cab and connect it
to the electrical plug (2) near the boom nose.
10.
Use the controller to pivot the jib so that lugs
(1,
Figure 4-20) on jib align with the holes in the lugs (2) on
the boom nose.
11.
Remove pins (1, Figure 4-21) stowed in extension and
install in holes (right side of boom nose) and secure with
retainer clips (2).
6642-5
1
FIGURE 4-16
6642-6
1
FIGURE 4-17
6642-7
1
FIGURE 4-18
2
1
FIGURE 4-19
2
6642-11
1
FIGURE 4-20
2
Reference Only
Содержание Grove TMS800E13
Страница 5: ...Operator Manual Grove TMS800E13 R e f e r e n c e O n l y ...
Страница 6: ...R e f e r e n c e O n l y ...
Страница 148: ...SET UP AND INSTALLATION TMS800E13 OPERATOR MANUAL 38 Published 02 06 2014 Control 495 00 R e f e r e n c e O n l y ...
Страница 162: ...LUBRICATION TMS800E13 OPERATOR MANUAL 14 Published 02 06 2014 Control 495 00 THIS PAGE BLANK R e f e r e n c e O n l y ...
Страница 166: ...OPERATOR MANUAL TMS800E13 APL 2 R e f e r e n c e O n l y ...
Страница 167: ...R e f e r e n c e O n l y ...
Страница 168: ...R e f e r e n c e O n l y ...